QUOTE(Babizz @ Feb 27 2015, 10:14 AM)
KTM klang to KL sentral is 55min i think.. LRT bkt tinggi to BU will be more than 1 hour based on 20 plus stops.. driving time to klang ktm is around 8mins from bkt tinggi.. Feasibility will increase if they cut down a few stations.. If ppl frm botanic go KL, they will use KESAS n cut into NPE.. my friends say driving thru jln langat is reli long/jam during peak hours.
Yes,during peak hours klang to KL is double of nonpeak via federal. I think jams in klang will become much worse when the LRT is undercon. good for long term investors.
The reason why KTM takes so long is cause at some stretch, the train slows down like crazy and sometimes stop for a while due to operational procedures. I believe LRT is a much better solution than KTM. Having said that, it will not impact ppl who use KTM to go to KL as it still is a better option. The LRT will benefit those that works in Shah Alam or Damansara area where previously they have to take the KTM to Sentral before taking the LRT back towards PJ, most likely they can now interchange at 1 of the stations and head directly to PJ.Yes,during peak hours klang to KL is double of nonpeak via federal. I think jams in klang will become much worse when the LRT is undercon. good for long term investors.
Peak hour from Klang KTM to/from Bukit Tinggi can take anywhere from 15mins to 30mins actually. So instead of driving and get tired from peak hour rush, can now chillax in the LRT until near home liao.
I also think once these public transportations (MRT and LRT) are done, traffic in KL and surrounding areas will be much better. I personally prefer to use public transport, but forced to drive around due to the inadequacies of the current public transportation systems.
Just the 2 cents from a Klang boy.
Feb 27 2015, 10:33 AM

Quote
0.0227sec
0.75
7 queries
GZIP Disabled