QUOTE(BaRT @ May 6 2014, 01:25 PM)
Before their merging TL Offshore can easily make bonus up to 8-10 months. Even some of Field Engineer with high flyers can get 12-13 months bonus.Long story, once they merging everything need to be equality.
Oil & Gas Careers V6, Upstream and Downstream
|
|
May 6 2014, 03:24 PM
Return to original view | Post
#1
|
![]() ![]() ![]()
Junior Member
316 posts Joined: Apr 2010 |
QUOTE(BaRT @ May 6 2014, 01:25 PM) Before their merging TL Offshore can easily make bonus up to 8-10 months. Even some of Field Engineer with high flyers can get 12-13 months bonus.Long story, once they merging everything need to be equality. |
|
|
|
|
|
Jun 12 2014, 09:26 AM
Return to original view | Post
#2
|
![]() ![]() ![]()
Junior Member
316 posts Joined: Apr 2010 |
|
|
|
Jun 12 2014, 10:31 AM
Return to original view | Post
#3
|
![]() ![]() ![]()
Junior Member
316 posts Joined: Apr 2010 |
QUOTE(abgkik @ Jun 12 2014, 10:22 AM) Trelleborg is the Australian company.. but ok lahh got Singapore office... but better call the Australian, better response.. we doing several for gumusut at MMHE yard..but only for riser clamp at one of the company in seri alam johor..the vulcanizing we import from outside..or try also http://www.iossb.com.my/ or ckjksb.com.. |
|
|
Jun 19 2014, 05:43 PM
Return to original view | Post
#4
|
![]() ![]() ![]()
Junior Member
316 posts Joined: Apr 2010 |
QUOTE(shazshah90 @ Jun 19 2014, 05:19 PM) as'salammualaikum ...I just wondering could anyone guide me a bit on my path. Good luck if you want to jump, small advice bear in mind thousand of people everyday looking opportunity to join oil n gas or want your current position I’m a graduate in mechanical engineering at Universiti Malaysia Pahang, after I graduated, I got my job here at sapurakencana petroleum (lumut) as graduate engineer in yard development department (which is more to civil engineering), I really want to jump to the projects department (PMD, even engineering department) but seems my manager won’t release me as I’m the only engineer left in this department. Do you have any advice to me on what I should I do? Should I stay and waits or it is already time I need to jump to other place? |
|
|
Jun 20 2014, 01:10 AM
Return to original view | Post
#5
|
![]() ![]() ![]()
Junior Member
316 posts Joined: Apr 2010 |
How come TTHE won this contract? They are not big player of FPSO even not have any drydocking to do conversion.
http://www.rigzone.com/news/oil_gas/a/1331...ect_Off_Sarawak |
|
|
Jun 20 2014, 10:17 AM
Return to original view | Post
#6
|
![]() ![]() ![]()
Junior Member
316 posts Joined: Apr 2010 |
|
|
|
|
|
|
Jun 20 2014, 10:20 AM
Return to original view | Post
#7
|
![]() ![]() ![]()
Junior Member
316 posts Joined: Apr 2010 |
QUOTE(x0x @ Jun 20 2014, 09:00 AM) They bought that half-cooked abandoned fpso @ dubai drydock worlds, direct talk with Petronas/JX Nippon...contract awarded..easy Yes the vessel was in Dubai named Deep Producer. It is Dynamic Positioning vessel, it is abandoned ship. Not sure some equipment or packages still can used.Of course coversion taking place @ dubai drydock...lotsa contacts working on that project But what make me confuse, how TTHE got this project? At least the worst this project shall go to MMHE since they are local champions on FPSO |
|
|
Jun 20 2014, 11:32 AM
Return to original view | Post
#8
|
![]() ![]() ![]()
Junior Member
316 posts Joined: Apr 2010 |
QUOTE(meonkutu11 @ Jun 20 2014, 10:47 AM) Just pity I heard they using money those who invest to tbg haji to go peform hajj to bought this vessel and construct FPSOseems politics now likely enter to oil n gas..where this people really need money badly and do whatever their want.... |
|
|
Jun 23 2014, 05:04 PM
Return to original view | Post
#9
|
![]() ![]() ![]()
Junior Member
316 posts Joined: Apr 2010 |
|
|
|
Aug 28 2014, 03:09 PM
Return to original view | Post
#10
|
![]() ![]() ![]()
Junior Member
316 posts Joined: Apr 2010 |
today I heard Technip Geo was reduce 20% employee this... seems a lot of company now practice to reduce manpower
Leighton Offshore - Closed OPE - Closed Petrofac Engineering/RNZ - reduce employee MMHE - reduced employee (VSS) Technip - reduce employee SBM - dont get project etc etc signs slow moving on market now |
|
Topic ClosedOptions
|
| Change to: | 0.0446sec
1.04
7 queries
GZIP Disabled
Time is now: 1st December 2025 - 05:08 PM |