QUOTE(Blu3_Darren @ Mar 7 2014, 06:54 PM)
Thank you for your information.
Since you mentioned TNB meter, if I wanna move it, then it needs to be their authorised officer or contractor right? Because how they did it was just drilling all over the party wall outside main entrance and drag all wires over just like that.
Any change before the meter is tnb, anything after the meter is house owner.Since you mentioned TNB meter, if I wanna move it, then it needs to be their authorised officer or contractor right? Because how they did it was just drilling all over the party wall outside main entrance and drag all wires over just like that.
Mar 7 2014, 07:43 PM

Quote
0.0158sec
0.54
6 queries
GZIP Disabled