QUOTE(t3arsCulprit @ Feb 28 2014, 11:32 AM)
You mean the PH train station platform share for both lines?
Oh.. Okay.. the Ampang line and Puchong line..
Perhaps they should separate these two line..
Btw, Subang line able to do 90 seconds?
No, no. I mean 90 seconds is not possible on that line, as the line branches out in two separate branches

A) Sentul Timur to Ampang
B) Sentul Timur to Putra Heights
If Puchong section is 90 seconds, then Sentul Timur - Chan Sow line section could have been 45 seconds which is not possible

Kelana Jaya/USJ that one can do 90 seconds.
This post has been edited by Kampung2005: Feb 28 2014, 11:40 AM