QUOTE(812799 @ Nov 9 2013, 06:49 PM)
updatessssss ... 2 more weeks to go
Living room plaster ceiling and holes for downlight done

Dining hall plaster ceiling and opening done ! Old fan placed there for measuring purposes
Concrete top cooling down in kitchen


Master bedroom washroom wall tiles and plaster ceiling done


Mini 4 "L" box blocks fr house entrance done

Why did d concerete table top was casted on d wall tile, not on d bare wall? Can it adhere well on d tiles top surface?Living room plaster ceiling and holes for downlight done

Dining hall plaster ceiling and opening done ! Old fan placed there for measuring purposes
Concrete top cooling down in kitchen


Master bedroom washroom wall tiles and plaster ceiling done


Mini 4 "L" box blocks fr house entrance done

Nov 10 2013, 08:36 AM

Quote
0.0174sec
0.80
7 queries
GZIP Disabled