> Bentong-Kota Bharu dual carriageway, Kelantan section will be tolled News

views
     
TSKampung2005
post Oct 21 2013, 04:55 PM, updated 13y ago

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
http://www.theedgemalaysia.com/business-ne...h-road-job.html

user posted image

KUALA LUMPUR: MMC Corp Bhd and its joint venture (JV) partner Mudajaya Group Bhd are believed to be the front runner for the central spine road project that stretches from Kota Baru in Kelantan to Simpang Pelangi in Bentong, Pahang.

The project is estimated to cost RM8 billion based on earlier reports, which quoted former Works Minister Datuk Seri Shaziman Abu Mansor.

According to a source, the MMC-Mudajaya JV intends to undertake the construction of the entire 465.3km central spine project and has submitted a proposal which is being studied by the authorities.

The project is divided into several packages. They are the Kota Baru-Kuala Krai, Kuala Krai-Sg Lakit Bridge, Sg Lakit Bridge-Gua Musang, Gua Musang- Kg Relong, Kg Relong-Raub, Raub-Bentong and Karak-Simpang Pelangi routes.

The project involves the building of new roads and upgrading of the existing two-lane roads into a four-lane motorway.

The tender for the first stretch of the project from Kota Baru to Kuala Krai in Kelantan was closed recently. It was reported that the Kota Baru-Kuala Krai portion is estimated to cost between RM1.2 billion and RM1.6 billion. It is understood that only this stretch will be subject to toll out of the 465.3km road as substantial volume of traffic is expected to pass through here, which is commercially viable.

The source said MMC-Mudajaya has proposed to undertake the construction of this stretch on a build-operate-transfer basis, in which the revenue derived will be used to finance the next phase of the project linking Kuala Krai to Karak.

“The Kuala Krai to Karak stretch is not feasible to be a tolled road as motorists will find alternative routes instead,” said an industry observer. The Gua Musang-Kg Relong and Kuala Krai-Karak portions are currently under construction.

The source said construction of the last stretch of the spine road that links Karak to Simpang Pelangi will only commence after the Kuala Krai to Karak portion is completed.

The central spine project has been in the government’s road programme since the 9th Malaysian Plan in 2009. It has also been identified as one of the key projects under the East Coast Economic Region master plan that will strengthen the North-South subcorridor.

Some of the benefits are improving accessibility to and from the more remote areas in central Kelantan and Pahang, and between Bentong and the south of Selangor and the Klang Valley. When completed, the central spine project will reduce travel time by half compared with eight hours currently from Kuala Lumpur to Kota Baru. The project marks the first partnership between MMC and Mudajaya, both seasoned players in the construction industry....


This article first appeared in The Edge Financial Daily, on October 11, 2013
mhchan2002
post Oct 21 2013, 04:59 PM

Getting Started
**
Junior Member
290 posts

Joined: Apr 2006
kelantan who will go..ppl go haadyai loh..so build direct to haadyai much better
fazlythewarrior
post Oct 21 2013, 05:00 PM

Getting Started
**
Junior Member
234 posts

Joined: Jun 2007
From: Kuala Lumpur



Kelantan section will be tolled. Later Jalan Gerik-Jeli will be jammed.

Btw its Simpang Pelangai la.
tessei
post Oct 21 2013, 05:02 PM

Enthusiast
*****
Senior Member
932 posts

Joined: Jan 2005
QUOTE(fazlythewarrior @ Oct 21 2013, 05:00 PM)
Kelantan section will be tolled. Later Jalan Gerik-Jeli will be jammed.

Btw its Simpang Pelangai la.
*
nanti semua lari ikut Gua Musang - Dabong - Jeli - Pasir Mas / Tumpat --> Kota Bharu route....


aressandro10
post Oct 21 2013, 05:04 PM

Getting Started
**
Junior Member
121 posts

Joined: Jan 2010
Finally....


So how long will it takes from now to finish... 10 years ?
fazlythewarrior
post Oct 21 2013, 05:05 PM

Getting Started
**
Junior Member
234 posts

Joined: Jun 2007
From: Kuala Lumpur



QUOTE(tessei @ Oct 21 2013, 05:02 PM)
nanti semua lari ikut Gua Musang - Dabong - Jeli - Pasir Mas / Tumpat --> Kota Bharu route....
*
Dabong will be packed after this. But prefer use PLUS exit Kuala Kangsar-Pgkalan Hulu-Gerik-Jeli.
SUSendau02
post Oct 21 2013, 05:05 PM

Look at all my stars!!
*******
Senior Member
3,180 posts

Joined: Jun 2009
From: Borlänge


QUOTE(aressandro10 @ Oct 21 2013, 05:04 PM)
Finally....
So how long will it takes from now to finish... 10 years ?
*
it shall be soon... its tolled bah
aressandro10
post Oct 21 2013, 05:05 PM

Getting Started
**
Junior Member
121 posts

Joined: Jan 2010
Mat said is building road to connect besut to gua musang.... Can escape toll already.
SUSAmeiN
post Oct 21 2013, 05:06 PM

★★★★★★★
*******
Senior Member
4,735 posts

Joined: Feb 2010
From: ★~Starlight~★
bila start bina?
TSKampung2005
post Oct 21 2013, 05:07 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(aressandro10 @ Oct 21 2013, 05:04 PM)
Finally....
So how long will it takes from now to finish... 10 years ?
*
Part of the Central Spine Road upgrade already in progress, but 1 thing I agree, this took so so long time.

user posted image
marsupilami
post Oct 21 2013, 05:07 PM

Casual
***
Junior Member
313 posts

Joined: Mar 2009
From: ✡ ✈ ▌▌

i dont mind paying if its safer and faster
aressandro10
post Oct 21 2013, 05:08 PM

Getting Started
**
Junior Member
121 posts

Joined: Jan 2010
It has been years since i last used gua musang route... Heard some portion already finished.


TSKampung2005
post Oct 21 2013, 05:09 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
KL-Kota Bharu in 4 hours.
simpul
post Oct 21 2013, 05:10 PM

Casual
***
Junior Member
326 posts

Joined: Jun 2007
From: Denai Alam



bgs la ada highway nie... baru la ada ekonomi skit masuk kelantan....
ApostLes`
post Oct 21 2013, 05:15 PM

Casual
***
Junior Member
409 posts

Joined: Jul 2006


QUOTE(Kampung2005 @ Oct 21 2013, 05:09 PM)
KL-Kota Bharu in 4 hours.
*
Wow once this and lpt completed

Kb to kl 4 hrs

Kb to ktn also 4 hrs

But need to wait for another 10 yrs atleast
blanket84
post Oct 21 2013, 05:16 PM

Regular
******
Senior Member
1,520 posts

Joined: May 2008
QUOTE(aressandro10 @ Oct 21 2013, 05:04 PM)
Finally....
So how long will it takes from now to finish... 10 years ?
*
Depending on who won the contract. If rm2 company then expect 10-15 years. If established company then 5-8years from contract award.
Boldnut
post Oct 21 2013, 05:16 PM

Look at all my stars!!
*******
Senior Member
2,209 posts

Joined: Nov 2010
110km/h? If not it is a stupid highway.
TSKampung2005
post Oct 21 2013, 05:18 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(Boldnut @ Oct 21 2013, 05:16 PM)
110km/h? If not it is a stupid highway.
*
I don't think it is same as PLUS. When they say upgrade to dual carriageway, expect something like Lebuh AMJ in Malacca or the Changlun-Perlis highway.
Boldnut
post Oct 21 2013, 05:19 PM

Look at all my stars!!
*******
Senior Member
2,209 posts

Joined: Nov 2010
QUOTE(Kampung2005 @ Oct 21 2013, 05:18 PM)
I don't think it is same as PLUS. When they say upgrade to dual carriageway, expect something like Lebuh AMJ in Malacca or the Changlun-Perlis highway.
*

110km/h is pretty safe these days, why these people never update.

TSKampung2005
post Oct 21 2013, 05:22 PM

Proudly Kampungite, will always be one.
Group Icon
VIP
3,028 posts

Joined: Feb 2005
From: 梅田,大阪 //Sabah
QUOTE(starcian @ Oct 21 2013, 05:18 PM)
I'm so lost here.

Isn't Gua Musang-Kg Relong is overlap between Kuala Krai-Karak?
And then MMC-Mudajaya undertake the construction of the entire 465.3km for RM8billion from Kota Bahru to Bentong?
*
I am also confused, I try to look at this map first.

user posted image

2 Pages  1 2 >
Bump Topic Add ReplyOptions New Topic
 

Change to:
| Lo-Fi Version
0.0147sec    0.30    5 queries    GZIP Disabled
Time is now: 9th December 2025 - 01:00 AM