QUOTE(maxxon @ Dec 1 2013, 01:45 AM)
My initial plan is to move in by end of Nov so that i can use it for my wedding in early Dec. I've tried my best to monitor the renovation progress but still it is unable to meet the date line... So, I just have to accept the fact and move on with other solution...
I wish it a smooth progress but do not intend to rush things out as I do not want a bad job that will probably be an eyesore and make me regret for many years living in it.
It is now going on with tiling job and will start installing the windows next week.
Works which are still pending are basically:-
- car porch tiling
- Lightings, fans, airconds and switches installation
- grills and gate
- folding door at kitchen (pending kitchen floor tiling)
- curtains
- kitchen cab
- laminate flooring for the whole 1st floor (will do after tiling job in bathrooms)
- wardrobe (it is ready and can be installed straight after the laminate floor)
- installing bathrooms fittings
Looks like a long way to go.. probably another 1 1/2 to 2 months based on the pending list.. considering year end is holiday season..I wish it a smooth progress but do not intend to rush things out as I do not want a bad job that will probably be an eyesore and make me regret for many years living in it.
It is now going on with tiling job and will start installing the windows next week.
Works which are still pending are basically:-
- car porch tiling
- Lightings, fans, airconds and switches installation
- grills and gate
- folding door at kitchen (pending kitchen floor tiling)
- curtains
- kitchen cab
- laminate flooring for the whole 1st floor (will do after tiling job in bathrooms)
- wardrobe (it is ready and can be installed straight after the laminate floor)
- installing bathrooms fittings
all the best and congrats