QUOTE(maxxon @ Oct 13 2013, 07:38 PM)
Wiring:-
Initial phase of wiring points has been done till further works later on lighting and switches installation. As this house is for own occupation, I've added a good number of extra power sockets too... so that I won't be regretting in future.
Don't forget to conceal the following cables too:Initial phase of wiring points has been done till further works later on lighting and switches installation. As this house is for own occupation, I've added a good number of extra power sockets too... so that I won't be regretting in future.
Fiber optic for fiber Internet.
Network cable to very room especially TV area. For stable media content and iptv delivery and to prevent wifi blind spot.
Alarm n CCTV cables.
Astro cable.
Speaker cable.
Armoured cable for auto gate.
10mA wall mounted RCCB at each water heater switch. (To double fail safe from electrocution during shower.)
Inverter aircon piping incase you want to instal inverter aircond instead of non inverter.
Oct 13 2013, 09:22 PM

Quote
0.0536sec
0.99
7 queries
GZIP Disabled