post Aug 26 2013, 06:10 PM

Enthusiast
*****
Group: Senior Member
Posts: 897

Joined: Oct 2010
if tsunami how?
SeanVinces
post Aug 26 2013, 06:28 PM

Getting Started
**
Group: Junior Member
Posts: 80

Joined: Dec 2006
From: Penang,Perak


It's still got phase 3 & phase 4.
charmhy18
post Aug 27 2013, 11:35 AM

Getting Started
**
Group: Junior Member
Posts: 67

Joined: May 2009


QUOTE(Ketchum @ Aug 26 2013, 05:24 PM)
charmhy18, look at this smile.gif
*
omg, so nicee!!!!
AxeFire
post Aug 30 2013, 10:48 AM

Casual
***
Group: Junior Member
Posts: 368

Joined: Oct 2012
From: Penang
Boon from E&O projects, STP phase 2 to generate RM9.8bil worth of jobs



GEORGE TOWN: The second phase of the Seri Tanjung Pinang (STP) development project, which has a gross development value (GDV) of RM25bil, is expected to generate RM9.75bil worth of construction and renovation jobs for the local construction industry.

Penang Master Builders and Building Materials Dealers Association president Datuk Lim Kai Seng told StarBiz that about RM2.25bil would be generated from renovation works.

“The remaining RM7.5bil would be spent for construction and building materials,” he said.

Lim was commenting on Eastern & Oriental Bhd’s plans to undertake RM25bil worth of residential and commercial projects to be carried out over 20 years for the second phase of STP. This would involve reclaiming 307ha (760 acres) of landbank in Tanjung Tokong.
The first stage of reclamation involved reclaiming 102ha (253 acres) of land, while the second stage, 507 acres.

E&O managing director Datuk Terry Tham had said that the first stage of reclamation would take about 30 months to complete and 10 years to develop the residential and commercial projects with RM8bil GDV.
Lim says about 60% of the construction and renovation jobs could be tendered out to Penang based contractors.

The second stage of reclamation will take four years to complete and 14 years to develop projects with a GDV of RM17bil, according to Tham.

“The RM8bil GDV of projects for the 102ha (253 acres) land would generate RM2.4bil worth of business opportunities for the local construction and building materials supply industry during the 10 years development period, creating at least RM720mil worth of renovation jobs.

“The RM17bil worth of projects for the 205ha land would generate RM5.1bil worth of jobs for the local construction and building materials supply industry during the 14 years development period, generating at least RM1.53bil worth of renovation jobs,” he said.

Lim said that the value of construction jobs was about 30% of the project’s GDV, while the value of renovation work, about 30% of the construction cost. About 60% of the construction and renovation jobs could be tendered out to Penang-based contractors.

“Most of the jobs for Penang-based contractors would involve the supply of raw materials and the provision of mechanical and engineering jobs. “The remaining 40% would usually be outsourced to Kuala Lumpur-based contracting firms that provide specialised jobs, especially for the commercial projects,” he said.

On the latest Construction Industry Development Board Malaysia (CIDB) report, Lim said the number of projects from the private and government sector awarded in Penang would remain flat.

“For the first half of 2013, the number of construction jobs from the private and government sectors given out in Penang totaled 149, compared with 147 in the same period a year ago. “Last year the overall number of private and government jobs given in Penang was 543. We expect the figure to remain more or less the same for 2013. For the first six months of 2013, the value of the construction jobs given out registered at RM3.79bil, compared with RM1.33bil a year ago same period.

“Due to the rising cost of building materials, we can expect the value of construction jobs to rise significantly this year,” Lim said.
In 2012, the value of construction jobs given out in Penang was about RM6.1bil.

More: http://www.thestar.com.my/Business/Busines...O-projects.aspx

This post has been edited by AxeFire: Aug 30 2013, 10:49 AM
Haste
post Aug 30 2013, 10:50 AM

Getting Started
**
Group: Junior Member
Posts: 86

Joined: Jun 2007
Penang need a theme park like genting tongue.gif
AxeFire
post Oct 2 2013, 08:50 PM

Casual
***
Group: Junior Member
Posts: 368

Joined: Oct 2012
From: Penang
More:


Grand reclamation plan set to reshape Gurney Drive
By Himanshu Bhatt, fz.com(contributor to theedgemalaysia.com)
Tuesday, 27 August 2013 16:15
http://www.theedgeproperty.com/news-a-view...rney-drive.html

GEORGE TOWN: The physical appearance of north-eastern Penang island is set to be radically altered, according to a massive plan to reclaim 360.57 hectares (891 acres) off Gurney Drive which was made public last Saturday.

With this, a new kidney-shaped island measuring some 307.56 ha (760 acres) will emerge from the sea directly in front of Straits Quay.

The present Gurney Drive will be pushed further out by about 80m to 100m by reclaiming 53.01 ha (131 acres) from the sea and a “Gurney Drive Linear Park” built on the new foreshore.

Two bridges will be built to the reclaimed island, one from Straits Quay and the other from Gurney Drive.

The development is dubbed Seri Tanjung Pinang Phase II (STP 2). It is a continuation of the existing 240-acre Seri Tanjung Pinang Phase I (where Straits Quay is located) along the reclaimed coast of Tanjung Tokong.

The project is being undertaken by Tanjung Pinang Development Sdn Bhd in which the state government has a share.

The company is jointly owned by E&O Property (Penang) with a 78.8% stake and the Penang government with 21.2%. E&O Property is a subsidiary of Eastern and Oriental Bhd (E&O).

The plan was unveiled during a public hearing last Saturday. Heading the panel was E&O managing director Datuk Terry Tham.

Also present was the director of Universiti Kebangsaan Malaysia’s Institute of Climate Change, Prof Dr Sharifah Mastura Syed Abdullah, who is a lead consultant for STP 2’s detailed environmental impact assessment (DEIA) study.

Inevitably, the scale of this project raised numerous concerns.

Changes to tides and ecosystem

One big worry is whether the project would worsen the tidal changes along Gurney Drive which have already resulted in ugly mud flats along the coast.

The deterioration of the sea here over the last few years is largely attributed to the earlier Tanjung Tokong reclamation where Seri Tanjung Pinang’s first phase was developed.

Sharifah Mastura said the current poor water quality in the surrounding areas will be improved with faster and direct discharge of water to the straits-like channel between Penang island and the new reclaimed island.

She said there will be improvement of water quality at the main drain outlet at Gurney Drive. Also, going right through the man-made island is a hydraulically engineered canal for flushing.

But the dredging activities for the channel certainly will dislodge existing seabed materials, affect the marine habitat and undersea organisms, she acknowledged.

(The dredged material will be disposed 20km off Muka Head on the north-western tip of Penang island.)

Impact on inshore fishermen

Sharifah Mastura said the reclamation process will introduce “fill materials” that will smother existing mudflats, as well as seabed and aquatic fauna.

(Sand for the reclamation work will be sourced from the sea 200km offshore from Lumut.)

She described the environmental and socio-economic impact, especially on local fishermen, as “major trade-offs”.

About 470 fishermen — from Tanjung Tokong, Gurney Drive, Pantai Paramount and Bagan Jermal — are expected to be impacted by the project.

The loss of fishing ground means they have to travel further to alternative grounds, Sharifah Mastura said.

Tham told the gathering that he would bring up the matter of helping the affected fishermen to the E&O’s board of directors and shareholders.

Possible help that can be given include compensation, developing new areas in the sea for aquaculture, and identifying new sea areas for fishing.

Features of the project

According to the fact sheet for the STP2 project, it is targeted to have about 12,000 homes, with 32% low-rise (less than four storeys), 45% medium-rise (five to 10 storeys) and 23% high-rise (more than 10 storeys).

Affordable housing will account for 30% of the total.

The project will also feature 28.45 sq ft of mixed-use commercial space. These include retail offices, service apartments, a tourism hub with seafront promenade, museum and marina, and also commercial offices.

There are plans for 35.6 ha (88 acres) of open space on the reclaimed island, with an additional 20.23 ha (50 acres) at Gurney Drive, and 12km along the coastline of the reclaimed island.

The total reclaimed land of 360.57 ha also includes 20% set aside as government reserve.

It is understood that half of this reserve is being eyed to be used for the Penang Outer Ring Road.

Public amenities to be built will include two schools, one private and another public; places of worship, a police station, a fire station, medical centre and clinics, a promenade, and park-and-ride facilities.

Impact assessment and public feedback

The project obtained approval-in-principal (AIP) from the Penang government in April 2011 for the proposed reclamation of 307.56 ha (760 acres) of the STP2.

Before the proposed reclamation works commence, a detailed environmental impact assessment (DEIA) is required to be conducted and approved by the Department of Environment.

The public dialogue is part of the DEIA approval process.

After the dialogue, feedback from the public will be compiled and incorporated into the DEIA.

The developer will then need to respond to the DEIA’s expert panel on the public feedback.

The panel will hold a review before a decision is made.

Meanwhile, the DEIA report that includes feedback from the public dialogue will be on display for 45 days beginning Oct 1. The public can submit their feedback and questions within this period.

This post has been edited by AxeFire: Oct 2 2013, 08:51 PM
myasiahobby
post Oct 2 2013, 08:54 PM

Casual
***
Group: Junior Member
Posts: 459

Joined: Dec 2009
From: Russia
Penang want to compete with singapork
HuorEarfalas
post Oct 2 2013, 08:56 PM

Getting Started
**
Group: Junior Member
Posts: 279

Joined: Sep 2006
From: Penang


Penang island property price sure skyrocket Liao.....

Thank you LGE for making me richer
$kidzl
post Oct 2 2013, 08:57 PM

Getting Started
**
Group: Junior Member
Posts: 70

Joined: Jul 2013
From: KL

Is this the same guys who offer a Lambo if you buy their RM10mill condo in KL?

2 Pages < 1 2
Bump TopicReply to this topicTopic OptionsStart new topic
 

Switch to:
| Lo-Fi Version
0.0604sec    2.96    5 queries    GZIP Disabled
Time is now: 23rd September 2018 - 10:14 AM