Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed
8 Pages « < 3 4 5 6 7 > » Bottom

Outline · [ Standard ] · Linear+

 Savanna Executive Suites, Freehold by Mahsing

views
     
Intel@Atom
post Oct 11 2013, 07:33 PM

Casual
***
Junior Member
360 posts

Joined: Nov 2008


QUOTE(Limpbizcuit @ Oct 11 2013, 06:55 PM)
can anybody confirm the bumi price is actually bumi discount price or it is a bumi lot that can't be transferred to non-bumi?
*
I think just bumi price not bumi lot but hope someone can confirm this for u
Intel@Atom
post Oct 11 2013, 10:29 PM

Casual
***
Junior Member
360 posts

Joined: Nov 2008


QUOTE(MoonRider @ Oct 11 2013, 08:29 PM)
with this block c and d sure tak jalan ..  thumbup.gif  thumbup.gif  meaning my block b1 will not be kacau the view by block c and d
*
Sooner or later saja
Intel@Atom
post Oct 11 2013, 10:30 PM

Casual
***
Junior Member
360 posts

Joined: Nov 2008


QUOTE(MoonRider @ Oct 11 2013, 10:15 PM)
Anyone sign the letter offer adi.. mbb sa say next week going to pass me the letter
*
Me also next week.
Intel@Atom
post Oct 13 2013, 07:44 PM

Casual
***
Junior Member
360 posts

Joined: Nov 2008


QUOTE(umarhanim @ Oct 13 2013, 06:55 PM)
1. SP Setia
2. Sunway Bhd
3. Sime Darby Property Bhd
4. UEM Sunrise Bhd
5. IGB Corp Bhd
6. Bandar Utama City Corp Sdn Bhd
7. UOA Development Bhd
8. Gamuda Bhd
9. I&P Group Sdn Bhd
10. Mah Sing Group Bhd
*
Dropped from 7th to 10th erm.....
Intel@Atom
post Oct 14 2013, 12:41 AM

Casual
***
Junior Member
360 posts

Joined: Nov 2008


QUOTE(Limpbizcuit @ Oct 14 2013, 12:37 AM)
IOI also tarak meh?
*
last year, i think ioi also wasn't listed in top 10
Intel@Atom
post Oct 14 2013, 02:05 PM

Casual
***
Junior Member
360 posts

Joined: Nov 2008


QUOTE(MoonRider @ Oct 14 2013, 01:57 PM)
so should i sign the letter offer ? .. the sa told me 14 days must sign/reject
*
who is your MBB SA? allan? actually what'll happen if we decline it later like change to other bank with better offer, or cancel the purchase or the developer bankrupt and etc? any liability?
Intel@Atom
post Oct 15 2013, 09:56 PM

Casual
***
Junior Member
360 posts

Joined: Nov 2008


QUOTE(MoonRider @ Oct 15 2013, 08:28 PM)
latest from today .. as 11am

block b1 total unit 24 floor x 14 = 336 units .. now remaining 25 units = 93% sold

block a1 total unit 24 floor x 14 = 336 units .. now remaining 125 units = 62% sold

block a2 total unit 24 floor x 18 = 432 units ... now remaining 104 units = 76% sold

one cheapest unit now rm348k .. tower a2 .. 13a floor 13a unit  rclxms.gif

today i go and check again .. do some calculation .. looks like my unit is facing tower c swimming pool (going to buy binocular) .. and the distance is around 7-8 cars long from tower b and c
*
Thx bro. Let's take turn and go and snap the latest booking. Any news when will they release block c and d?

Have u signed ur mbb offer letter?

This post has been edited by Intel@Atom: Oct 15 2013, 09:57 PM
Intel@Atom
post Oct 15 2013, 11:38 PM

Casual
***
Junior Member
360 posts

Joined: Nov 2008


QUOTE(MoonRider @ Oct 15 2013, 11:11 PM)
the sa still processing the ol ... i think this weekend will received the ol .. probaly sign within 2 weeks .. but my concern is still with snp .. need to make sure all the materials ie full tiling for bathroom, freebies  and etc
*
i heard the SA said both toilet will be fully tiled except the kitchen which should be 5 feet height. it is also important to confirm their floor tile is 2x2 coz smaller than that is not grand anymore.
Intel@Atom
post Oct 16 2013, 09:53 PM

Casual
***
Junior Member
360 posts

Joined: Nov 2008


QUOTE(MoonRider @ Oct 16 2013, 09:47 PM)
i think u not 100% right .. i predict tower c may occupied by china doll ... those rich fags want a safe place to keep the doll ...
*
lolx..... r u one of them?
Intel@Atom
post Oct 17 2013, 08:33 PM

Casual
***
Junior Member
360 posts

Joined: Nov 2008


QUOTE(Diablo143 @ Oct 17 2013, 05:55 AM)
Wonder if RHB also have the same ruling on the savings account? I have already applied for MBB loan but thinking if should submit to RHB...
*
i dont think there is a real reason behind because you can open an account easily with any bank and less than an hour.
Intel@Atom
post Oct 17 2013, 10:11 PM

Casual
***
Junior Member
360 posts

Joined: Nov 2008


QUOTE(MoonRider @ Oct 17 2013, 09:57 PM)
anyhow i have submit for rhb as well today ..  see who provide good service mbb or rhb .. then i choose the sa  rclxms.gif
*
r y applying the RHB loan from Vivian? becoz she is rclxm9.gif
Intel@Atom
post Oct 18 2013, 09:43 PM

Casual
***
Junior Member
360 posts

Joined: Nov 2008


QUOTE(DrPitchard @ Oct 18 2013, 02:57 PM)
More importantly, has anybody received loan approval at the BLR-2.45% rate, as claimed by them? Or is it just a marketing gimmick to attract potential customers, only to disappoint them with a -2.40% rate?
*
I called the rhb today, they said approved dy but at 2.4 only. They are still appealing it. Erm....
Intel@Atom
post Oct 19 2013, 07:08 PM

Casual
***
Junior Member
360 posts

Joined: Nov 2008


QUOTE(Limpbizcuit @ Oct 19 2013, 06:32 PM)
just back from Nouvelle Hotel. they're now open B2 for sale
*
How many percent is still available for b2? Is it same price range as b1 or same with a1/a2?
Intel@Atom
post Oct 25 2013, 07:59 PM

Casual
***
Junior Member
360 posts

Joined: Nov 2008


QUOTE(akh731 @ Oct 25 2013, 10:29 AM)
are they launch the shop lot?
or sold out?
*
Yes. I think they launched two weeeks ago.
Intel@Atom
post Nov 3 2013, 08:46 PM

Casual
***
Junior Member
360 posts

Joined: Nov 2008


QUOTE(661188 @ Nov 3 2013, 06:01 PM)
Condo Showroom at site ready 1-december. Go in from bangi tol then head to bangi lama.
*
Ya saw them start to paint dy. Good news. Any idea when the interchange will be ready?
Intel@Atom
post Nov 5 2013, 08:17 AM

Casual
***
Junior Member
360 posts

Joined: Nov 2008


QUOTE(ceveori @ Nov 4 2013, 11:20 PM)
landed there 2.5sty also RM850k ftw  blink.gif
*
Ya. Over priced. For landed, maybe further a bit then can consider few more projects along the plus highway; UEM, sime darby, ijm.
Intel@Atom
post Nov 8 2013, 06:03 PM

Casual
***
Junior Member
360 posts

Joined: Nov 2008


PPassbythe show room just now which should be ready soon and it looka grand smile.gif
Intel@Atom
post Dec 20 2013, 10:46 PM

Casual
***
Junior Member
360 posts

Joined: Nov 2008


QUOTE(genchwan @ Dec 20 2013, 10:36 PM)
why still no news on signing S&P?
*
ya, wondering when can sign the SNP. have anyone contacted the SA?
Intel@Atom
post Dec 29 2013, 12:39 AM

Casual
***
Junior Member
360 posts

Joined: Nov 2008


QUOTE(fli_guy84 @ Dec 24 2013, 11:42 PM)
Just received a letter from Mah Sing today. I thought it was some information for the SPA signing but instead it's just a notice about privacy.

Did anyone else receive this letter too?
*
i received that letter as well, is there any action from us? previously i did receive similar but via email from Mah Sing but i just ignore it.
Intel@Atom
post Dec 29 2013, 04:10 PM

Casual
***
Junior Member
360 posts

Joined: Nov 2008


QUOTE(fli_guy84 @ Dec 29 2013, 02:03 PM)
I'm not sure either. sweat.gif  But I'll take about 30 minutes to really read what is in the letter some time later.
*
keep us posted smile.gif

8 Pages « < 3 4 5 6 7 > » Top
Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0555sec    0.53    7 queries    GZIP Disabled
Time is now: 18th December 2025 - 08:11 PM