QUOTE(mohdyakup @ Jun 29 2013, 03:28 PM)
SA project finished already ar? Oil & Gas Careers v5, Upstream and Downstream
Oil & Gas Careers v5, Upstream and Downstream
|
|
Jul 1 2013, 06:49 PM
Return to original view | Post
#1
|
![]() ![]() ![]() ![]()
Senior Member
509 posts Joined: Apr 2011 |
|
|
|
|
|
|
Jul 25 2013, 09:07 AM
Return to original view | Post
#2
|
![]() ![]() ![]() ![]()
Senior Member
509 posts Joined: Apr 2011 |
Ranhill downsized from 1200 employees to 600 a couple of months back. Now kena suspend indefinitely and officially by the mighty yellow coveralls pulak. Nasib badaaan...
|
|
|
Aug 29 2013, 11:24 AM
Return to original view | Post
#3
|
![]() ![]() ![]() ![]()
Senior Member
509 posts Joined: Apr 2011 |
QUOTE(E Crew @ Aug 24 2013, 01:08 AM) I got a friend who has been working in OnG industry for decades and retired last year.Then recently he sign a contract with exxonmobil for 2 years as consultant.When I asked him how much he is paid, he refuse to tell me One does not simply ask another man's salary. That's "Gentlemen Rules". QUOTE(engrfeez @ Aug 26 2013, 03:29 PM) My friend got married, when Gumusut is first cut steel at MMHE. Now he got 3 kids yet still no production. Petronas should build another Semi FPS. One Gumusut-Kakap-Style is simply not enough. I believe Petronas will never ever built Semi FPS anymore in this region. QUOTE(mohdyakup @ Aug 27 2013, 11:41 PM) Guys, SSB/SSPC CAT1 Offshore Construction Department ada layan tak? Boss punya kepala ada sporting best tak? Ceciter2 hehe Aik! Macam pisang goreng panas! BTW, camel_active is a she? And yeah, anyone cycle around here? This post has been edited by noruazumi: Aug 29 2013, 11:35 AM |
|
|
Aug 30 2013, 02:59 PM
Return to original view | Post
#4
|
![]() ![]() ![]() ![]()
Senior Member
509 posts Joined: Apr 2011 |
QUOTE(mohdyakup @ Aug 29 2013, 05:34 PM) Good for you, bro! Sorry for not saying Hi! when you are still working on SA-PA/SA-AA. QUOTE(camel_active @ Aug 29 2013, 08:59 PM) yes.! i'm 'she'. The only girl in construction team? Site people would be extremely glad to see you around. the only girl in construction team..hahaha..but now oredi move on to engineering..anyone have vacancy for site engineer? QUOTE(Stamp @ Aug 29 2013, 09:35 PM) I think Petronas wanted all major types of deep-water production facilities to be built/installed in Msia. I don't know but FLNG-like concept seems good. I don't know the economy-mechanism behind it tho'. It is just seems more practical, I think lah.Kikeh is a SPAR, Gumusut a Semi-FPS, Malikai will be a Tension-Leg Platform I heard. I wonder what's next? subsea only? |
|
|
Nov 11 2013, 10:29 PM
Return to original view | Post
#5
|
![]() ![]() ![]() ![]()
Senior Member
509 posts Joined: Apr 2011 |
QUOTE(Stamp @ Nov 10 2013, 03:00 PM) i hope the contractor who gets the contract will perform better than the previous contractor. it seems to me that the single contract like this indirectly promotes non-competitiveness and affects the quality of the work. it's really frustrating watching the 'tidak-apa' attitude of the previous Pan Msian contractor when we were desperate to meet the installation date target of our new facilities. rasa mcm nak terajang jer... Not much qualities in our local workforce which contributes to project delays. Lots of repeating works. But...Sometimes, clients also one kind. During engineering, all depends on Consultant and EPCIC contractor to check on everything. Client's side punya engineering, punya operation don't want to get involved and don't check properly. When it is time for construction, baru want to comment here and there. Site already done the job then baru come in tunjuk hero. When construction done, then comm team pulak masuk tunjuk hero one more round, then after that operation pulak. If everything is signed off and agreed by everyone during engineering stage, the rest of the process will not be too difficult to handle and reduce double works. Also, these days, "fast track project" is being abused kaw-kaw. Detailed engineering not like it used to be, now it is only like 3-4 months only. Consultants have mountains of deliverables, and most of the time didn't get approval from client within the approved turnaround period. In the end, construction starts before AFC. How lah? |
|
|
Nov 11 2013, 10:49 PM
Return to original view | Post
#6
|
![]() ![]() ![]() ![]()
Senior Member
509 posts Joined: Apr 2011 |
QUOTE(BillySteel @ Nov 10 2013, 01:35 PM) Normally the company will pay for your training or they will forward you an advance for the amount. If your medical report tak pass, go to Miri, sure can pass. If you want short-cut BOSIET, go to Miri, sure cepat. At KLCC Medical Center for Petronas projects medical was about RM450-ish.... with Shell medical (shell requires the extra questionnaires for its projects) + another RM100++. Prices you can call the clinics to find out.The other operators I am not so sure. I only heard of 3 centers in Malaysia for BOSIET OPITO approved, one of them is ALAM (Melaka), MSTS (Johor) and another one not sure Miri? |
|
|
Nov 12 2013, 09:57 AM
Return to original view | Post
#7
|
![]() ![]() ![]() ![]()
Senior Member
509 posts Joined: Apr 2011 |
QUOTE(lampard53 @ Nov 12 2013, 08:35 AM) i will be doing my offshore medical check up this week. i just want to ask is it hard to pass? i'm kinda worried but i don't have any health problems though If you don't have health issues, then there should not be a problem. But do know that sometimes "body cavity check" is required. p/s: that "thumbs up" means something else. |
|
|
Nov 13 2013, 08:28 PM
Return to original view | Post
#8
|
![]() ![]() ![]() ![]()
Senior Member
509 posts Joined: Apr 2011 |
QUOTE(engrfeez @ Nov 13 2013, 02:16 PM) Yes, I heard also they don't have much project after most of it have taken by TTHE or Sapukencang. Some friends contracts are not being renewed due to lack of projects.Some rumors said might be thousand of employees will receive the VSS soon due to project not too much. This post has been edited by noruazumi: Nov 13 2013, 08:28 PM |
|