QUOTE(elmond @ Jun 30 2015, 07:33 PM)
toll will use open system, likes GCE.
initial design, no access from GCE that heading north direction, i think there don't have any reason for bukit jelutong user to not using NKVE for KL destination.
initial design for denai alam to kwasa, there are one toll, if from denai alam to penchala link, there are two tolls
initial design for puncak alam to kwasa, there are one toll, if from puncak alam to penchala link, there are two tolls
initial design, total 3 tolls been built but only need to paid from one (persiaran surian or kota damansara exit) to two tolls, so one can assume the denai alam toll (from puncak alam) will be higher thna the rest of two.
Haiya... No chance to connect to penchala link/ldp now? Would love to see that interchange being more complicatedinitial design, no access from GCE that heading north direction, i think there don't have any reason for bukit jelutong user to not using NKVE for KL destination.
initial design for denai alam to kwasa, there are one toll, if from denai alam to penchala link, there are two tolls
initial design for puncak alam to kwasa, there are one toll, if from puncak alam to penchala link, there are two tolls
initial design, total 3 tolls been built but only need to paid from one (persiaran surian or kota damansara exit) to two tolls, so one can assume the denai alam toll (from puncak alam) will be higher thna the rest of two.
This post has been edited by rickyro: Jul 27 2015, 08:51 PM