Investment Damansara-Shah Alam Elevated Expressway (DASH), How can it benefit investors?

views
     
howiseveryone
post Dec 10 2013, 09:54 PM

Getting Started
**
Junior Member
165 posts

Joined: Sep 2008
QUOTE(elmond @ Dec 10 2013, 04:08 PM)
you are right the concept similar NPE, but consider full elevated,

denai alam toll & mutiara damansara toll elevated, RRIM toll on ground
Below was the study introduction, of course change may apply, key was highlighted in red

3.2.1  Lane Requirements
The Expressway is generally a dual 3 lane carriageway of with 3.5m lane widths and
3m paved shoulder
with a design speed of 80 kph.  In areas with constraints,
particularly in urban conditions and in areas of difficult terrain, a lower design speed
and double deck with cross sectional requirements may be considered but would be
subjected to the approval of the Government.

3.2.2  Interchanges
The project involves the construction of thirteen  grade separated interchanges.
These interchanges are:
i)  Puncak Perdana Interchange
ii)  Alam Suria Interchange
iii)  Denai Alam Interchange
iv)  Kg. Melayu Subang Interchange
v)  Galaksi Interchange
vi)  Subang 2 Interchange
vii)  Subang Airport Interchange
viii)  RRIM Interchange
ix)  Surian Interchange
x)  Kenanga Interchange
xi)  Mahogani Interchange
xii)  Damansara Perdana Interchange
xiii)  Penchala Interchange

3.2.3  Toll Plaza
There shall be three (3) main line toll plaza on the expressway which are located
before Denai Alam Interchange, RRIM, and Mutiara Damansara. Both manual and
electronic collection shall be adopted in these open toll system. Table 3.2.1 shows
the location of the toll plazas and the minimum lane requirement. The names of the
toll plaza will be determined and approved later by LLM. The numbers of toll lane
required for each toll plaza are based on the forecast traffic volume and the type of
toll collection system used.
*
great info!!... did i miss any link before this - where u get this?. really interested to know when and progress.


howiseveryone
post Dec 11 2013, 03:34 PM

Getting Started
**
Junior Member
165 posts

Joined: Sep 2008
QUOTE(elmond @ Dec 11 2013, 10:21 AM)
google this, you will get a pdf link for a study case.
"The Expressway is generally a dual 3 lane carriageway of with 3.5m lane widths and
3m paved shoulder with a design speed of 80 kph.  In areas with constraints,
particularly in urban conditions and in areas of difficult terrain, a lower design speed
and double deck with cross sectional requirements may be considered but would be
subjected to the approval of the Government. "
*
Thanks!!!... i googled, got the link but it must be broken or site could be down. Browser unable to load the page/pdf file. sad.gif

howiseveryone
post Dec 11 2013, 03:43 PM

Getting Started
**
Junior Member
165 posts

Joined: Sep 2008
QUOTE(eeki @ Dec 11 2013, 02:07 PM)
this is how DASH highway will pass through DP area

user posted image
*
is this the latest route?. if yes, this is going to be right next to and on top of the terrace houses and shop offices. not to mention, a church building and maybe a temple will come up next to the police station.
blink.gif
howiseveryone
post Dec 11 2013, 04:00 PM

Getting Started
**
Junior Member
165 posts

Joined: Sep 2008
QUOTE(bat11 @ Dec 11 2013, 03:55 PM)
I think will kena my emerald la. Damn it! Why the road so weired wan... A curve like that... Stupid design!
*
it follows the road which is curved. to go straight means to cut through shop offices which, can't happen. this looks like it will be next to police station and then frenscino and straight into perdana's main road.


howiseveryone
post Dec 11 2013, 04:23 PM

Getting Started
**
Junior Member
165 posts

Joined: Sep 2008
QUOTE(elmond @ Dec 11 2013, 03:43 PM)
that the reason no sharing on the link in public.
i think they now realize the hole, so bad.
*
u downloaded a copy?. can share aaa?.
howiseveryone
post Jan 13 2014, 10:06 PM

Getting Started
**
Junior Member
165 posts

Joined: Sep 2008
QUOTE(zyde @ Dec 24 2013, 03:53 PM)
Just talked to my friend- contractor that involve soil investigation for DASH highway. Confirm the highway will start from Mutiara Damansara to Shah Alam. (project already started last month)
*
do u know which part started?.
howiseveryone
post Apr 2 2014, 11:08 AM

Getting Started
**
Junior Member
165 posts

Joined: Sep 2008
QUOTE(zyde @ Jan 16 2014, 12:40 PM)
lol, i need to ask him again. He only said Mutiara Damansara.
*
strange. why would they start on the most contentious area first. anyhow, the only active construction work I can see there is for MRT.
howiseveryone
post Apr 2 2015, 09:50 AM

Getting Started
**
Junior Member
165 posts

Joined: Sep 2008
i heard that becoz KIDEX being shelved for now, DASH also laying low until later part of this year.... true aa? :-(
howiseveryone
post Oct 17 2016, 09:25 AM

Getting Started
**
Junior Member
165 posts

Joined: Sep 2008
I heard last month confirmed DASH REALLY started liao....they've started ground work from Puncak Alam to Kwasaland Sg. Buloh. thumbup.gif but will take another 3-5 years to complete (depending on which way the upcoming GE will go) tongue.gif