Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

Investment Damansara-Shah Alam Elevated Expressway (DASH), How can it benefit investors?

views
     
Humanoid
post Oct 12 2019, 05:04 PM

Getting Started
**
Junior Member
139 posts

Joined: Apr 2012
QUOTE(aaron1717 @ Oct 1 2019, 02:15 PM)
cantik boss... more cars coming to PMD to use DASH in future dah....  mega_shok.gif  mega_shok.gif
*
where is this PMD and the Kampung road to access Setia Alam ar?
Humanoid
post May 12 2020, 11:57 AM

Getting Started
**
Junior Member
139 posts

Joined: Apr 2012
https://www.youtube.com/watch?v=XmZNiZqX7mc
https://www.youtube.com/watch?v=gjhzKyx1Mpw&t=214s
https://www.youtube.com/watch?v=_MsVcpclSFU


this is more recent.. around April.. can see some of the junction Exit and Entry...
Humanoid
post May 12 2020, 04:52 PM

Getting Started
**
Junior Member
139 posts

Joined: Apr 2012
QUOTE(Zenph @ May 11 2020, 09:48 PM)
Can I have more info for this?
I passed by this road before.. need to pass through the cemetery right? I don't see any road works but I do remember passing by a kampung road. Is there any road to be constructed in the future?
*
watch this, is in it.. https://www.youtube.com/watch?v=XmZNiZqX7mc
Humanoid
post Jun 8 2020, 12:46 PM

Getting Started
**
Junior Member
139 posts

Joined: Apr 2012
Wa.. thats pretty much a sharp turn there.. expecting accident prone to happen quite often...


Attached thumbnail(s)
Attached Image
Humanoid
post Jun 16 2020, 12:26 PM

Getting Started
**
Junior Member
139 posts

Joined: Apr 2012
QUOTE(elmond @ Jun 15 2020, 11:10 AM)
from side view, it's go up so the design no problem to reduce speed.

user posted image
*
scare some midnight drunkard or what... never see that curve coming.. not play play for a highway ending that way haha, can fly out straight...lets see when it complete...
Humanoid
post Jan 26 2021, 03:13 AM

Getting Started
**
Junior Member
139 posts

Joined: Apr 2012
This is even more recent one.. some package is almost 100% ready

https://www.youtube.com/watch?v=fqcM3zmtu_s
https://www.youtube.com/watch?v=DJ_YmbSihf8
https://www.youtube.com/watch?v=J7nxW80J4mc&t=5s

Humanoid
post Jan 26 2021, 10:31 AM

Getting Started
**
Junior Member
139 posts

Joined: Apr 2012
QUOTE(Ichighost @ Jan 26 2021, 10:12 AM)
how big is the impact of this highway for north west of KV area?

travelling time from one end to another? if you have any updated link for further reading can just put here.
*
they claimed can reduce 90min travel time to 15min... I think benefits a lot from puncak alam , alam budiman, setia alam those...and those who wanna go Ipoh and Kuala Selangor, rather than taking outer route VIA NKVE
https://youtu.be/qUnBSuXUwTA?t=149
Humanoid
post Jan 26 2021, 10:36 AM

Getting Started
**
Junior Member
139 posts

Joined: Apr 2012
QUOTE(kelvinfixx @ Jan 26 2021, 10:28 AM)
RM 1.80?
*
IIRC, there will be total 3 tolls across the whole stretch of the highway... RM1.80/toll would be really expensive to use, imagine u need from one end to another end and go KL, (RM1.80 x 3) = RM5.40, then need to pass by Penchala Link toll, RM3.00 per way... round trip would be Rm16.80 per day.. thats insane..

compare destination to destination NKVE from Setia Alam - Damansara is RM2.21 (used to be RM2.70) vs this also Setia Alam - Damansara also.

taking reference from LKSA by same owner Prolintas, the Alam Impian toll is RM0.70... hoping each toll can be around that range than will be sweet point...
Humanoid
post Jan 27 2021, 09:03 AM

Getting Started
**
Junior Member
139 posts

Joined: Apr 2012
QUOTE(elmond @ Jan 26 2021, 05:49 PM)
that not correct, the original plan is 2 tol max.
but the latest video i saw, there dont put tol at RRIM. that might means only 1 tol from 1 end to another end
*
oh ya forgot the RRIM toll is for those car came in in the half way

This post has been edited by Humanoid: Jan 27 2021, 09:50 AM

 

Change to:
| Lo-Fi Version
0.0385sec    0.62    7 queries    GZIP Disabled
Time is now: 17th December 2025 - 04:40 PM