QUOTE(Kampung2005 @ Apr 18 2013, 11:53 AM)
I hope they really build it.
Right now, the definite plan is to rebuild Kuantan-Kerteh line into electrified double tracking, RM 2 billion.
A major challenge will be to build long railway tunnel across Titiwangsa. Costly but will become technical marvel of Malaysia like Switzerland
KL to Kuantan may take 90 minutes or up to 2 hours on this rail.
fuuuu.. when is the expected completion date for kuantan-kerteh? the train will be passing by my hometownRight now, the definite plan is to rebuild Kuantan-Kerteh line into electrified double tracking, RM 2 billion.
A major challenge will be to build long railway tunnel across Titiwangsa. Costly but will become technical marvel of Malaysia like Switzerland
KL to Kuantan may take 90 minutes or up to 2 hours on this rail.