Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

 High Speed Rail Link Singapore Malaysia

views
     
junjiang
post Feb 23 2013, 10:23 AM

New Member
*
Junior Member
13 posts

Joined: Jan 2011


From civil engineer's point of view, construction cost will be lower if HSR is built on flat terrain in avoiding tunnels and elevated viaduct. Because the vertical and horizontal profile, i.e. requirements of small gradient and large radius shall be fulfilled due to high speed.

 

Change to:
| Lo-Fi Version
0.0342sec    0.23    7 queries    GZIP Disabled
Time is now: 7th December 2025 - 11:47 PM