Hi all, a credit to philipcs for using this picture before everything
As seen in the picture, the ducting is hidden in the plaster ceiling. Red line is indicating the ducting pipe. What is the work flow to have this outcome?
I've asked the plaster ceiling guy, he says that I need to install the hood first before he can create the plaster to hide my ducting pipe. Should I install the hood first before everything else even my kitchen cabinet is not ready? Is there a standard measurement from ground I should install my hood? Im using Fotile EH13 hood.
Please help, thanks
Ducting hidden in plaster celing, work flow