QUOTE(WL6016 @ Sep 3 2013, 11:37 AM)
Based on allocation below, some are bumi n non bumi
Alam Impian Nukilan, Anyone staying at Nukilan?
|
|
Sep 3 2013, 12:22 PM
Return to original view | Post
#41
|
![]() ![]()
Junior Member
146 posts Joined: Jan 2011 |
|
|
|
|
|
|
Sep 6 2013, 02:00 PM
Return to original view | Post
#42
|
![]() ![]()
Junior Member
146 posts Joined: Jan 2011 |
Go makan makan? |
|
|
Oct 6 2013, 11:53 PM
Return to original view | Post
#43
|
![]() ![]()
Junior Member
146 posts Joined: Jan 2011 |
QUOTE(sycluap @ Oct 6 2013, 09:34 PM) For those who are concern about the loji pemprosesan behind Nukilan 3, here some snap shot (sorry for the bad angle, as the trees blocked, this is the only unit I can climb up as previous 2 completed units with better angle were locked). Thanks for the info, sycluap taikor. Hope InP will plant the trees at thr buffer zone, to make the loji invisible.In short: 1. There are quite a distance away from the last row of Nukilan 3 to the loji. Only the area looks big from the map. 2. The loji are covered, and small portion of the big area. 3. From the snapshot, you can already notice the trees blocked the view. What if InP plant trees (beautify) on the buffer zone as planned in Nukilan 3 layout plan, isn't it will be completely invisible? ![]() ![]() |
|
|
Oct 29 2013, 09:11 AM
Return to original view | Post
#44
|
![]() ![]()
Junior Member
146 posts Joined: Jan 2011 |
Any update on Nukilan3 status?
|
|
|
Oct 29 2013, 09:30 AM
Return to original view | Post
#45
|
![]() ![]()
Junior Member
146 posts Joined: Jan 2011 |
|
|
|
Nov 19 2013, 09:13 AM
Return to original view | Post
#46
|
![]() ![]()
Junior Member
146 posts Joined: Jan 2011 |
Any update on Nukilan3 and Tenun?
|
|
|
|
|
|
Nov 19 2013, 07:57 PM
Return to original view | Post
#47
|
![]() ![]()
Junior Member
146 posts Joined: Jan 2011 |
QUOTE(sycluap @ Nov 19 2013, 05:00 PM) No significant changes on Nukilan 3 progress as I can see, except the 'Island' rows almost complete and the rows surrounding it working on the compound fencing wall now. How about the fence on the edge of Nukilan3, the contractor already start installing?As for the few rows from the entrance nearer to the mosque, still on the brickworks. |
|
|
Nov 19 2013, 10:18 PM
Return to original view | Post
#48
|
![]() ![]()
Junior Member
146 posts Joined: Jan 2011 |
|
|
|
Nov 19 2013, 11:05 PM
Return to original view | Post
#49
|
![]() ![]()
Junior Member
146 posts Joined: Jan 2011 |
|
|
|
Nov 30 2013, 08:38 AM
Return to original view | Post
#50
|
![]() ![]()
Junior Member
146 posts Joined: Jan 2011 |
Do they start to build the fence wall on the last row backing the loji? How is the fence wall look like? |
|
|
Nov 30 2013, 02:49 PM
Return to original view | Post
#51
|
![]() ![]()
Junior Member
146 posts Joined: Jan 2011 |
|
|
|
Dec 3 2013, 02:28 PM
Return to original view | Post
#52
|
![]() ![]()
Junior Member
146 posts Joined: Jan 2011 |
|
|
|
Dec 29 2013, 05:47 PM
Return to original view | Post
#53
|
![]() ![]()
Junior Member
146 posts Joined: Jan 2011 |
Photo taken yesterday.
![]() ![]() ![]() |
|
|
|
|
|
Dec 29 2013, 09:36 PM
Return to original view | Post
#54
|
![]() ![]()
Junior Member
146 posts Joined: Jan 2011 |
|
|
|
Dec 31 2013, 10:32 PM
Return to original view | Post
#55
|
![]() ![]()
Junior Member
146 posts Joined: Jan 2011 |
|
|
|
Dec 31 2013, 11:02 PM
Return to original view | Post
#56
|
![]() ![]()
Junior Member
146 posts Joined: Jan 2011 |
QUOTE(sycluap @ Dec 31 2013, 10:41 PM) Talking about Tenun. This morning I drove the the factory area opposite the last row. Although at same ground level, but the direct front of the row is an empty land. How many units still available for Tenun?If InP build proper fencing and plant trees to create buffer zone, think it will be fine. So far the row facing the factory land plot is the slowest sales. |
|
|
Jan 5 2014, 02:10 PM
Return to original view | Post
#57
|
![]() ![]()
Junior Member
146 posts Joined: Jan 2011 |
QUOTE(sycluap @ Jan 4 2014, 12:23 PM) After sneaking in 3 times, I'm pretty much sure for items below: Hope N3 can VP earlier....yea1. Nukilan 3 comes with alarm system. What additional I notice is it comes together with smoke detector. Motion detector and windows/doors sensor all included. 2. There will be NO shower screen for all the bathroom, clarified this with developer. But hope there will be last minute surprise. 3. The build quality is very good. Judge based on my inspection on both finished and under construction units. 4. 1 major drawback, I believe to be design fault is the door cannot be fully open for guest bath room. I attached the picture some posts back. But when I talk to I&P regarding this, they say they already buy off and verified, it should be able to fully open. We shall wait and see what's the outcome. If cannot fully open, can put it in defect list. 5. CCC takes around 6 months time for all relevant department to approve the fitness of the building for occupation. So, project work should end by June 2014, but VP most likely until 2015. Latest must be 22/2/2015 before LAD imposed. Hope above information helps. |
|
|
Jan 5 2014, 07:41 PM
Return to original view | Post
#58
|
![]() ![]()
Junior Member
146 posts Joined: Jan 2011 |
QUOTE(sycluap @ Jan 5 2014, 07:38 PM) Ok, just back from sneak in operation to Nukilan 3 to confirm on the shower screen. And the answer is YES, master bedroom bathroom come with shower screen, 7 feet, opaque type, enclosing square shower area. Good to hear...The workmanship on the few random check houses were very good. Will post a few images later. |
|
|
Jan 6 2014, 08:03 PM
Return to original view | Post
#59
|
![]() ![]()
Junior Member
146 posts Joined: Jan 2011 |
|
|
|
Jan 7 2014, 06:18 PM
Return to original view | Post
#60
|
![]() ![]()
Junior Member
146 posts Joined: Jan 2011 |
|
| Change to: | 0.0345sec
0.25
7 queries
GZIP Disabled
Time is now: 7th December 2025 - 07:13 AM |