Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

 Alam Impian Nukilan, Anyone staying at Nukilan?

views
     
Kenneth G
post Aug 12 2013, 09:36 PM

New Member
*
Junior Member
47 posts

Joined: Jun 2013
QUOTE(sycluap @ Aug 12 2013, 05:09 PM)
High Ceiling @ Family Area
user posted image

Timber Flooring Close Up
user posted image

Master bedroom bath, shower head direct from top/ceiling
user posted image

Master bedroom bath, wash basin
user posted image

Water Closet (all toilets)
user posted image

Washroom @ Guest Bedroom (Ground floor), major drawback, door cannot be fully open, blocked by wash basin. Need to feedback to InP
user posted image

Fence, half wall, not like model house showing full hollow from ground
user posted image
*

wonder what can inp do for guest room door issue?

Kenneth G
post Aug 12 2013, 10:48 PM

New Member
*
Junior Member
47 posts

Joined: Jun 2013
QUOTE(sycluap @ Aug 12 2013, 10:11 PM)
Hi Kenneth, if you follow the link I provided, image# below are taken from the Master Bedroom. iPhone camera is just not wide enough to capture the whole room  biggrin.gif
-> 0394 - 0401
-> 0404
-> 0416 - 0418

From the floor layout plan I obtained (non finalized version), the master bedroom should be:

Total area: 15'-8'' x 22' = 344.67 sqft
Bathroom area: 7'-11'' x 8'-7'' = 67.9514 sqft
Room area = 344.67 - 67.9514 = 276.7186 sqft
*
Hi sycluap, tq for your clarification, maybe I overlook. Hmm..276 sqft is quite small right? Maybe living room upstairs took up some space as see from photo looks quite big
Kenneth G
post Aug 12 2013, 10:51 PM

New Member
*
Junior Member
47 posts

Joined: Jun 2013
QUOTE(sycluap @ Aug 12 2013, 10:18 PM)
For the guest room toilet door issue, I think we shouldn't highlight anything for now, as the construction ain't completed yet, furthermore, I curi-curi take picture this time. To prevent any unwanted/unhappy outcome, let's just wait. If they really prepare the house to become show house in October, then we can feedback at that time.

Most probably InP will work out something on this. Maybe:
1. Changing to smaller but wider wash basin?
2. Reposition the wash basin?
3. Smaller door width / sliding door?

Actually, there's 1 more minor drawback which I didn't highlight here which the dry area outside kitchen. As the door is open to outside direction, the area where plug point and water pipe area for the washing machine in my opinion is a little bit small, causing the door unable to open fully  sad.gif . But this is a very small issue, it depends on where you want to put your washing machine. But if have chance, i will ask InP about this also.
*

you are right, lets wait n see, no worries bro u contributed so much we won't put u in bad situation:)

Kenneth G
post Aug 12 2013, 11:06 PM

New Member
*
Junior Member
47 posts

Joined: Jun 2013
QUOTE(sycluap @ Aug 12 2013, 10:54 PM)
I think from a gross calculation like this you can't really image/feel how big/small is it. When I refer to the floor plan, I do have the same concern as you. But after a walk through today at the actual house, I felt different. All the space can't say big and I would say not small either. Except for the guest room toilet, something has to be done.

For me, it is just nice. Of course I like big house too, but for an 22x80 and can get something like this, can't really complain already. Hmmm... how can I really explain... hmm.gif
*
Haha actually my wife is the one who is asking this. As u know women always want their room to be as big as possible for their wardrobe:). She keep on hoping the room size close to canting 3 master room, we been there n she quite like the size:)
Kenneth G
post Aug 12 2013, 11:21 PM

New Member
*
Junior Member
47 posts

Joined: Jun 2013
QUOTE(sycluap @ Aug 12 2013, 11:13 PM)
If this is the case, the Canting 3 is bigger in terms of the area for the wardrobe  biggrin.gif But you can still build a wardrobe there in your Nukilan 3, don't you?  biggrin.gif  Dressing area for master bedroom itself is 8'-7'' x 7'-9'' = 66.5208 sqft

Family area for Nukilan 3 is bigger than Canting 3, mostly due to the staircase design.

Btw, why did not getting Canting 3 before this?
*
Oh..in this case I think nukilan 3 size should be smaller. I can't find a unit I like last year in canting 3, in term of house facing direction, looking for facing south but unable to get one. But is ok I like nukilan 3 facade:) haha must say what I bought good la. To make myself feel happy:)
Kenneth G
post Aug 12 2013, 11:28 PM

New Member
*
Junior Member
47 posts

Joined: Jun 2013
QUOTE(sycluap @ Aug 12 2013, 11:23 PM)
No problem bro, there's a new 24x80/90 launching soon next to Pentas 4. Get 1 more unit bro, your wife will be very happy smile.gif This unit can be for investment biggrin.gif
*
I will die bro:( haha but u think is good for investment? By the way from ur photo main entrance door material good? Look so so only from the photo, but I might be wrong
Kenneth G
post Aug 12 2013, 11:38 PM

New Member
*
Junior Member
47 posts

Joined: Jun 2013
QUOTE(sycluap @ Aug 12 2013, 11:33 PM)
Main entrance door is solid wood, very heavy and sturdy. When you knock, your hand will feel pain biggrin.gif It looks so-so because it was not finished yet, guess they will paint it and apply shellac or so?
*
Oh good to hear that! Tq tq smile.gif ur info really help me to understand my future home better! U plan for own stay or invest?
Kenneth G
post Aug 13 2013, 08:57 AM

New Member
*
Junior Member
47 posts

Joined: Jun 2013
QUOTE(sycluap @ Aug 12 2013, 11:55 PM)
For the time being is for own stay. If I strike lottery maybe will consider a bigger unit in AI and this will be for investment  biggrin.gif  Guess you will be for own stay too right?
*
Yup I buy for own stay as well:)
Kenneth G
post Aug 13 2013, 09:42 PM

New Member
*
Junior Member
47 posts

Joined: Jun 2013
QUOTE(sycluap @ Aug 13 2013, 06:49 PM)
Would like to ask, for existing Nukilan 1 & 2, is there already a committee? Normally the committee is set up per phases or whole Nukilan as one?

I'm asking this because wanted to learn from the Pentas taikors, if we can have Nukilan fenced up too.
*
That really need other taikors advise. But I think your idea is good, hope someone can enlighten us on this
Kenneth G
post Aug 18 2013, 12:00 AM

New Member
*
Junior Member
47 posts

Joined: Jun 2013
QUOTE(sycluap @ Aug 17 2013, 11:58 PM)
Yeah, I come across that too. I was asking if Nukilan also have something similar in few posts back. No response so far. I am thinking if we should start forming an unofficial group for this.  hmm.gif
*
How do we start?
Kenneth G
post Sep 24 2013, 08:16 PM

New Member
*
Junior Member
47 posts

Joined: Jun 2013
QUOTE(sycluap @ Sep 24 2013, 07:11 PM)
Got, I have the soft copy. Will share later. Just reach home.

Personally, the floor plan does not attract me.  blink.gif
*
Thanks Scyluap, you are like SA here:)
Kenneth G
post Sep 26 2013, 09:10 PM

New Member
*
Junior Member
47 posts

Joined: Jun 2013
QUOTE(WL6016 @ Sep 26 2013, 10:15 AM)
Same to me, kitchen area design no good.  like sqeezing to cook....blink.gif
*
Thought kitchen quite similar to nukilan 3?
Kenneth G
post Sep 28 2013, 03:57 PM

New Member
*
Junior Member
47 posts

Joined: Jun 2013
QUOTE(1ullaby @ Sep 28 2013, 02:58 PM)
Thanks for sharing
Looks to move faster than pentas 4 as well
*
Many people attend?
Kenneth G
post Sep 30 2013, 10:22 PM

New Member
*
Junior Member
47 posts

Joined: Jun 2013
QUOTE(1ullaby @ Sep 30 2013, 10:18 PM)
Alarm points will be given  nod.gif
*
Ooops...that's not so good I think. Luckily nukilan 3 has alarm system. I am surprise Tari only have alarm point
Kenneth G
post Oct 3 2013, 08:25 PM

New Member
*
Junior Member
47 posts

Joined: Jun 2013
Look good
Kenneth G
post Oct 6 2013, 03:20 PM

New Member
*
Junior Member
47 posts

Joined: Jun 2013
QUOTE(sycluap @ Oct 6 2013, 08:35 AM)
I were there to see Nukilan 3 too. sneaked in to the site again to view the houses, been chased out by the site supervisor tongue.gif

I think should be no problem to complete construction at Jun 2014 as CF application normally takes 6 months. Thus, VP will be still Feb 2015, follow 24 months from SnP date.

Btw, for those who interested in Nukilan 3, as of 5 Oct, latest sales status: 2 intermediate facing west, 1 intermediate facing south and 2 corners is available due to previous loan rejected.
*
Bro any idea how much corner lot asking for?
Kenneth G
post Oct 6 2013, 05:48 PM

New Member
*
Junior Member
47 posts

Joined: Jun 2013
QUOTE(sycluap @ Oct 6 2013, 03:28 PM)
Bro, the corner price between 980k to 1.1M. The detailed price, built up and land size I have to check again on the price list. Update you by tonight.
*
Thanks!
Kenneth G
post Oct 6 2013, 08:12 PM

New Member
*
Junior Member
47 posts

Joined: Jun 2013
QUOTE(sycluap @ Oct 6 2013, 07:42 PM)
2 of the corner unit available as of 5-Oct as below:

1. Unit#72, bumi unit, total land 4920sqft, built-up 3440sqft, RM994,888/RM925,246. Type D1.

2. Unit#86, non bumi unit, total land 4180sqft, built-up 3440sqft, RM1,000,888/RM930,826. Type D1.
*
Thanks bro! Thought below rm 1M maybe want to consider, seems like have to give up
Kenneth G
post Oct 18 2013, 08:40 AM

New Member
*
Junior Member
47 posts

Joined: Jun 2013
QUOTE(sycluap @ Oct 17 2013, 10:06 PM)
Guys, opinion needed. Shall we start a Facebook group for Nukilan 3 for easier information sharing? Or this forum is sufficient for all Nukilan 3 owners?
*
I think is a bit early now, maybe we start when VP is around the corner?
Kenneth G
post Jan 4 2014, 02:19 PM

New Member
*
Junior Member
47 posts

Joined: Jun 2013
QUOTE(sycluap @ Jan 4 2014, 12:23 PM)
After sneaking in 3 times, I'm pretty much sure for items below:

1. Nukilan 3 comes with alarm system. What additional I notice is it comes together with smoke detector. Motion detector and windows/doors sensor all included.
2. There will be NO shower screen for all the bathroom, clarified this with developer. But hope there will be last minute surprise.
3. The build quality is very good. Judge based on my inspection on both finished and under construction units.
4. 1 major drawback, I believe to be design fault is the door cannot be fully open for guest bath room. I attached the picture some posts back. But when I talk to I&P regarding this, they say they already buy off and verified, it should be able to fully open. We shall wait and see what's the outcome. If cannot fully open, can put it in defect list.
5. CCC takes around 6 months time for all relevant department to approve the fitness of the building for occupation. So, project work should end by June 2014, but VP most likely until 2015. Latest must be 22/2/2015 before LAD imposed.
Hope above information helps.
*
I remember I saw shower screen in master bath room when I sneaked in last time. Hopefully there is surprise from inp

3 Pages < 1 2 3 >Top
 

Change to:
| Lo-Fi Version
0.0371sec    0.42    7 queries    GZIP Disabled
Time is now: 5th December 2025 - 04:51 AM