Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

 Anggun 2 Residence

views
     
hman
post Mar 11 2013, 02:11 AM

Getting Started
**
Junior Member
91 posts

Joined: Aug 2011
Yes, it is corner lot, I think that should be a house extension work, saw a lot of Iron material on the road, Living room extend? or swimming pool maybe thumbup.gif

No understand why some people like to complaint this & that, they only have to take care their house enough la, why complaint so many on others. Unless, their design is technically affect you, then u make complaint la doh.gif

For me, at-least I wish to make my entrance bigger from 4' to 10', fully extend until same row with window, otherwise the space are too narrow for praying table cry.gif
And, will extend the divider until letter box to make the garden more privacy rclxms.gif
hman
post Mar 11 2013, 06:41 PM

Getting Started
**
Junior Member
91 posts

Joined: Aug 2011
Congratulation to Anggun2 Owner brows.gif

I just saw a approval letter stick on that corner house, management approve their side Ground & 1st Floor extension, & Wet kitchen ground floor extension.

Heard from the worker there, the extension part are almost 13'

Which of you will renovate your unit soon?
hman
post Mar 13 2013, 04:43 PM

Getting Started
**
Junior Member
91 posts

Joined: Aug 2011
Hi, don't buy the normal instant water heater for your master bathroom.

There were a difffrent type of small boiler to install on top ceiling, and you can attach with the pump as well.

A Rawang lighting shop's taukeh whose is familiar with Anggun project told me this.
hman
post Mar 14 2013, 01:00 AM

Getting Started
**
Junior Member
91 posts

Joined: Aug 2011
I hope goverment build as many highway as they can, I totally don't mind to pay Toll, haha.

Yschaw, you are too much dreaming for the heater, haha.

Lutlut, that's possible, you have to check with your suppliers, maybe u can try ask them to install the pump beside Tangki with power support by Solar, then install the boiler only on master bathroom, i think this should work, but u have to confirm with your supplier.

P/S : If you thinking to install boilder that can supply to all bathroom, then u have to relay the piping, and this will cost you a lot, normally will using stainless steel pipe
hman
post Mar 14 2013, 06:41 PM

Getting Started
**
Junior Member
91 posts

Joined: Aug 2011
yschaw, i agree with u.

Jeghui, I think Rawang is not your cup of tea, you can try look for others area. Or maybe u go offer for Anggun 1, smaller unit, maybe u can find one below 800k, good luck biggrin.gif

Will you guy install Iron Grill? Which type is your favourite, Wrought Iron? Stainless Steel? or Normal one?


hman
post Mar 15 2013, 11:47 PM

Getting Started
**
Junior Member
91 posts

Joined: Aug 2011
Wookl10, congrats : )
hman
post Mar 18 2013, 10:38 PM

Getting Started
**
Junior Member
91 posts

Joined: Aug 2011
QUOTE(Hello_kitty 89 @ Mar 18 2013, 08:12 PM)
Cos my office will be moving to Kota damansara soon sad.gif
Heard about jam, then haih. . Petrol + tol. Make me headache
*
Should be ok if you leave your house early, I try few time to Rawang from Kota Damansara about 5pm, the traffic is ok, not that teribble.
hman
post Apr 4 2013, 06:50 PM

Getting Started
**
Junior Member
91 posts

Joined: Aug 2011
This weekend install Pump & Boilder rclxms.gif

Got advise from my friend, the advantage of pump is to increase the water pressure, this everyone know. Beside of that, you will know whether the internal piping are leaking or not.
hman
post Apr 9 2013, 12:11 AM

Getting Started
**
Junior Member
91 posts

Joined: Aug 2011
QUOTE(bearbear @ Apr 5 2013, 12:36 AM)
so which route did you go with the renovation?
*
I dare not to start any building extend yet, no any update news from Management office yet, even the OPTION to choose also rumour.

But the pump & boilder already installed, water flow very strong now, if u guy need the installer, the one did for me is reliable, he solve some problem for me without extra charges, not like other try to find extra tiny job to charge extra.
hman
post Apr 9 2013, 02:46 PM

Getting Started
**
Junior Member
91 posts

Joined: Aug 2011
QUOTE(yschaw @ Apr 9 2013, 11:45 AM)
The water pressure for my unit is dam low, think the pump is a must.
*
Yup, U need that : )

U can go for Grundfos, CM5 is more suitable because developer give us big piping. PM me if u need any info, I can recomend the man to u

hman
post Apr 9 2013, 02:47 PM

Getting Started
**
Junior Member
91 posts

Joined: Aug 2011
Last small unit for sale from Developer, I didn't ask but I saw the notice, not mistakne is RM938K now
hman
post Apr 9 2013, 11:41 PM

Getting Started
**
Junior Member
91 posts

Joined: Aug 2011
QUOTE(yschaw @ Apr 9 2013, 08:43 PM)
Intermediate units Not sold out oredi mei?
*
I am not too sure, I didn't ask, but it is Intermediate unit on right hand side, maybe Loan not approve.
hman
post Apr 11 2013, 08:03 PM

Getting Started
**
Junior Member
91 posts

Joined: Aug 2011
QUOTE(Chris Chew @ Apr 10 2013, 01:43 AM)
What size is this?
*
build up : 2685

 

Change to:
| Lo-Fi Version
0.0171sec    0.54    7 queries    GZIP Disabled
Time is now: 7th December 2025 - 11:06 AM