QUOTE
SPAD has since clarified in a press statement that TTDI houses may not need to be acquired simply because the properties are located beyond the 20m minimum buffer zone.
How does the TTDI residents knows exactly the closest buffer zone is 14m when SPAD informed it is beyond 20m? Anyhow I also think that MRT Corp never promise of acquisition but says that is possibilities that, that might happen.
QUOTE
They claimed that the tracks, some of which were being built just 14 metres away from their homes, is causing noise pollution and damage to their properties.
Wait, MRT Crop is already starting to lay tracks? Or do they mean pylons?
This post has been edited by Piros: Dec 5 2012, 01:55 PM
Dec 5 2012, 01:53 PM
Quote
0.0190sec
1.48
6 queries
GZIP Disabled