Welcome Guest ( Log In | Register )

16 Pages « < 11 12 13 14 15 > » Bottom

Outline · [ Standard ] · Linear+

 Casa green condo seri minang

views
     
IReallyNeed Answers
post Jul 13 2015, 06:34 PM

Krazeybender
*****
Senior Member
921 posts

Joined: Jan 2008
From: Cheras


QUOTE(ahnicnic @ Jul 13 2015, 06:32 PM)
Wow....  drool.gif
finishing macam not bad ya......

The main door not finish rite?
Coz the surface macam  sweat.gif
*
Kinda finished I think, but the place still damn dusty and dark, so quality looks mah mah!
IReallyNeed Answers
post Jul 13 2015, 06:44 PM

Krazeybender
*****
Senior Member
921 posts

Joined: Jan 2008
From: Cheras


QUOTE(Pink218 @ Jul 13 2015, 06:38 PM)
Thanks for the updates!
The toilet bowl n wash basin look cheapo..the lift too!
*
The basin and toilet bowl still acceptable, unless you don't like the design!

But i have to agree, lift damn cheapo
IReallyNeed Answers
post Jul 13 2015, 10:48 PM

Krazeybender
*****
Senior Member
921 posts

Joined: Jan 2008
From: Cheras


QUOTE(ahnicnic @ Jul 13 2015, 08:08 PM)
Will it b sticker skin for stainless steel?
remove the skin when VP
*
Currently it's just all steel la!

Maybe will paste sticker or something.

But overall really cheapo
IReallyNeed Answers
post Jul 13 2015, 10:59 PM

Krazeybender
*****
Senior Member
921 posts

Joined: Jan 2008
From: Cheras


QUOTE(adrian0229 @ Jul 13 2015, 10:54 PM)
nice photo dude...rmbr bank me in money for the fees  tongue.gif
*
Bank account number, gst number!

For claiming purpose!

Hahaha
IReallyNeed Answers
post Jul 14 2015, 08:36 AM

Krazeybender
*****
Senior Member
921 posts

Joined: Jan 2008
From: Cheras


QUOTE(blnh76 @ Jul 14 2015, 08:30 AM)
I thought there should be a door between master bedroom toilet and basin?
*
There is indeed a door, a sliding door.
IReallyNeed Answers
post Jul 14 2015, 08:53 AM

Krazeybender
*****
Senior Member
921 posts

Joined: Jan 2008
From: Cheras


QUOTE(doomdoom @ Jul 14 2015, 08:46 AM)
Unit itself looK's good, corridor too narrow, looks like around 6ft width only, the lift lobby need some wall tiles...
*
didnt measure the width of the corridor, but agree that it should have been wider, as for the lift, it's puzzled you as much as me!

haha
IReallyNeed Answers
post Jul 14 2015, 02:38 PM

Krazeybender
*****
Senior Member
921 posts

Joined: Jan 2008
From: Cheras


QUOTE(HELLO HELLO @ Jul 14 2015, 02:28 PM)
Corridor width consider ok. Can count the floor tiles. Should be 1x1 or 1.5x 1.5 tiles... Roughly 6ft+. Consider ok.

Lift area is a major problem. Without wall tiles. Very hard to maintain 1. Finger print, foot print, scratch, dirty water spread mark and macam macam. Once on it. Jialat.
*
yeah, balik balik also the lift that's giving headache now.

but looking at my first pic at pg101 post#2005

you'll see that the lift area is tiled up, so i am expecting something similar

as for the lift itself....... i also dont know if thats the final product.

guts feeling says no since if they do nice nice now sure kena scratch la and stuff

but takkan once complete, they will have the effort to dismantle the door and re installed something nicer?

anyone have dealing with lift before?
IReallyNeed Answers
post Jul 14 2015, 07:56 PM

Krazeybender
*****
Senior Member
921 posts

Joined: Jan 2008
From: Cheras


QUOTE(rodimusconvoy @ Jul 14 2015, 07:42 PM)
Dear All,

Latest update after calling Amber Homes. I talked with Ronald (boss) after I mentioned that we are going to lodge complaints on the name with "Pangsapuri"  in which he did acknowledge this issue and now is arranging Architect to submit appeal to MPKJ after seeing the FB comment. We will wait for his update again...

Besides that, for the electricity matter, the application of Single Phase is under the consultation of professional from the M&E team, and we shall measure if the supply is able to withstand the demand later...

About the maintenance charges rate, the management is still yet to finalise taking the consideration of FB query but emphasize it is up to future JMB to decide as well as the money collected is for the purpose of maintenance and management of common area.

For the internet and telephone cable, they have chosen TM / Unifi because of the readiness infrastructure as compare with other ISP.

Ronald also mentioned that he did read through Lowyat forum and FB as well but did not comment due to do not want to over promise. He stated that we Casa Green buyer will get value for money...

That's all for today. TQ
*
rodi the negotiator rclxm9.gif rclxm9.gif

as for the eletric box, if cannot withstand the demand how?

they'll cover the charges to change to3phased?

ahha

so big boss also kaki /k
IReallyNeed Answers
post Jul 16 2015, 12:05 PM

Krazeybender
*****
Senior Member
921 posts

Joined: Jan 2008
From: Cheras


QUOTE(ahnicnic @ Jul 16 2015, 12:02 PM)
i think around rm7-10 per sqft gua.... not really sure  tongue.gif

Seringin Residences putting on the clubhouse rooftop
quite impressive  thumbup.gif
*
Let's hope mr Ronald will be kind to us!

Give us nice nice grass wall:)

We Belanja him Makan la if he sayang us!
IReallyNeed Answers
post Jul 18 2015, 03:37 AM

Krazeybender
*****
Senior Member
921 posts

Joined: Jan 2008
From: Cheras


QUOTE(adrian0229 @ Jul 16 2015, 04:28 PM)
1st is address...2nd issue is the lift...hope we get a good finishing at the end of sept...another 2 months ya!!
*
There's so much mystery...

Dah Raya, and VP soon.

So kan cheong le!

But I've asked an apprant "sifu" in construction

Based on the value of our condo, technically is just middle range la, tak Sampai pun luxury pricing.

And he agree that the lift if probably permanent one already! And can't do much except putting on sticker

And the wall is partially painted also suggest no further plastering or tiling will be done too.

So hopefully nice wall paper and lift sticker will be used to beautify the place for us!
IReallyNeed Answers
post Jul 18 2015, 12:04 PM

Krazeybender
*****
Senior Member
921 posts

Joined: Jan 2008
From: Cheras


QUOTE(calvin989898 @ Jul 18 2015, 06:55 AM)
When would expected VP date for Casa Green? Looks not bad at all, value for money in my opinion. For the price you all paid, for now probably will only can get 1100-1200 sqft.
*
VP according to the management should be by Sept this year,

So I think late sept or early October will be the time!

That's for block A

Block B is december
IReallyNeed Answers
post Jul 18 2015, 03:20 PM

Krazeybender
*****
Senior Member
921 posts

Joined: Jan 2008
From: Cheras


QUOTE(jpaul @ Jul 18 2015, 03:06 PM)
Since block a is very nearby to the mosque, any idea how is the noise condition during prayer time?
*
I've driven over there before, the lower level of block A can heard the calls to prayers, but it'll be very minimal, I was walking arnd the back and did not realize until I really paid attention to it!
IReallyNeed Answers
post Jul 18 2015, 04:19 PM

Krazeybender
*****
Senior Member
921 posts

Joined: Jan 2008
From: Cheras


QUOTE(rodimusconvoy @ Jul 18 2015, 03:58 PM)
Thanks for sharing.
U really got many lubang to understand the construction work (really Sensei)
Ronald did mentioned since Casa Green is the flagship project, he will try to ensure the quality of final products to be comparable with those high end projects...
within next 2 months, we shall see how...
*
I kancheong and kepoh only! First property, very excited mah!
IReallyNeed Answers
post Jul 18 2015, 04:21 PM

Krazeybender
*****
Senior Member
921 posts

Joined: Jan 2008
From: Cheras


QUOTE(rainman19 @ Jul 18 2015, 04:13 PM)
Curious to find out
Any available units after 3 years?
*
By 3 years you mean

1. 3years from VP

Or

2. 3 years since launch?

Based on my understanding, there's already some ppl that are planning to flip even now.

As for 3 years down the road,with highway nearing completion and mrt functioning, probably more will flip for a big pay day!
IReallyNeed Answers
post Jul 18 2015, 06:47 PM

Krazeybender
*****
Senior Member
921 posts

Joined: Jan 2008
From: Cheras


QUOTE(HELLO HELLO @ Jul 18 2015, 06:10 PM)
For the lift. If no Wall tiles. As long as they apply some wax paint ok Liao. Will looks clean n nice.
*
But the lift itself looks like besi buruk :'(
IReallyNeed Answers
post Jul 18 2015, 07:43 PM

Krazeybender
*****
Senior Member
921 posts

Joined: Jan 2008
From: Cheras


QUOTE(HELLO HELLO @ Jul 18 2015, 07:10 PM)
During manyak renovation going on. Just remember to request your management use this to protect your lifts.
*
But based on what we saw that day, it doesn't look like there's any sticker paste on it!

We hadn't had the chance to look inside tho.

Let's hope for the best for all owners !
IReallyNeed Answers
post Jul 18 2015, 08:45 PM

Krazeybender
*****
Senior Member
921 posts

Joined: Jan 2008
From: Cheras


QUOTE(ceriss @ Jul 18 2015, 08:41 PM)
Can I ask how many lifts serving per block?
*
Four lift per block
IReallyNeed Answers
post Jul 18 2015, 11:41 PM

Krazeybender
*****
Senior Member
921 posts

Joined: Jan 2008
From: Cheras


I don't see the problem with the fencing la, mmg now all condo and housing unit like this design.

The blue gate and our fencing is separated by a storm drain I think, should be a no issue I suppose!
IReallyNeed Answers
post Jul 23 2015, 09:29 AM

Krazeybender
*****
Senior Member
921 posts

Joined: Jan 2008
From: Cheras


Won't gua, main lobby is tile up,

As per each floor, our floor is me and you d, left 6 units of suspect! Easier to catch!hahaha


IReallyNeed Answers
post Jul 23 2015, 11:36 AM

Krazeybender
*****
Senior Member
921 posts

Joined: Jan 2008
From: Cheras


QUOTE(peri peri @ Jul 23 2015, 10:18 AM)
fuyoh, the tiles so ugly. i did not know nowaday still got architect prefer sahara color
*
helo peri gor!!!

long time no see nod.gif nod.gif

you go see the lift of casa green, just a few post above, lagi pening rclxub.gif

16 Pages « < 11 12 13 14 15 > » Top
 

Change to:
| Lo-Fi Version
0.1159sec    0.64    7 queries    GZIP Disabled
Time is now: 18th December 2025 - 12:36 AM