QUOTE(abgkik @ Sep 5 2012, 12:34 PM)
mmhe don't have qs before?Oil & Gas Career v4, Technical Sharing & Career Opportunities
Oil & Gas Career v4, Technical Sharing & Career Opportunities
|
|
Sep 5 2012, 01:18 PM
Return to original view | Post
#1
|
![]() ![]()
Junior Member
92 posts Joined: Jul 2007 From: Jerusallem, Palestine |
|
|
|
|
|
|
Nov 9 2012, 10:47 PM
Return to original view | Post
#2
|
![]() ![]()
Junior Member
92 posts Joined: Jul 2007 From: Jerusallem, Palestine |
QUOTE(MUFTW @ Nov 9 2012, 09:57 AM) Hello every buddy good morning, As long as they can make profit. Look at crude oil price.for those who working in OnG field, is it true that most of the OnG company in Malaysia are expanding ? i heard from my friends who work in OnG field, like most of their company are expanding, like technip, exxon etc why is this phenomena happening ar ? economic turn better ? so more operator invest on E&P ? hence more project ?? QUOTE(boylikegirl @ Nov 9 2012, 08:23 PM) hey guys, a quick one. after topside install at offshore worksite, u need to do some integration works of system e.g. Piping electrcal etc and u complete by system then u can start the commissioning n ready for startup...handover to to operatorCan anyone of you give me a definition of hook up and commissioning?? I searched on the net but can't get a clear answer. Thanks guys |
|
|
Dec 8 2012, 08:28 PM
Return to original view | Post
#3
|
![]() ![]()
Junior Member
92 posts Joined: Jul 2007 From: Jerusallem, Palestine |
QUOTE(Pisanggoreng @ Dec 8 2012, 10:59 AM) hey guys...it's me again, i have a question.. Structural fabrication engineering got three basicallywhy for shop drawings, there exists two types of drawings, one is "normal" shop drawings and another is NDE shop drawings.. Can anyone explain to me what is NDE and what are the differences of both drawings? thanks. 1)shop dwgs - framing plans, layout, details which is detailed from AFC dwgs, detailed to beams/assembly no 2)NDE dwgs - plan dwgs which got welding joint nos and details 3)cutting plan - a cutting layout of plates,tubs with heat no. Im not a structural eng, hope its correct |
|
|
Dec 24 2012, 05:49 PM
Return to original view | Post
#4
|
![]() ![]()
Junior Member
92 posts Joined: Jul 2007 From: Jerusallem, Palestine |
QUOTE(new in IT @ Dec 24 2012, 05:41 PM) Hi all, Potable water engineerI am a fresh grad here with a degree in Water & Wastewater Technology. CGPA 3.75. If I wanna work offshore, what position is suitable? Anyway, does oil rig need people to treat water or wastewater on board so that people working there can have safer water to use and wastewater get to be cleaned before recycle or dump away? |
|
|
Jan 16 2013, 12:02 AM
Return to original view | Post
#5
|
![]() ![]()
Junior Member
92 posts Joined: Jul 2007 From: Jerusallem, Palestine |
QUOTE(echobrainproject @ Jan 15 2013, 09:14 AM) I am a degree holder in mech eng and i am a firewatcher QUOTE(Miss 1 @ Jan 15 2013, 10:23 PM) Hi again all, This guy if im not mistaken is part of petronas group but not sure on the benefits and so on..I think cooling plant near Alamanda Putrajaya is manage by them and also UTP cooling planti dont know whether this is related to u guys or not but im asking anyway coz i need to gather some info. does anyone knows about this company gas district cooling sdn. bhd.? how is the business? profits? stable? anyone deal with this company before? |
|
|
Jan 16 2013, 09:52 PM
Return to original view | Post
#6
|
![]() ![]()
Junior Member
92 posts Joined: Jul 2007 From: Jerusallem, Palestine |
QUOTE(abgkik @ Jan 16 2013, 01:39 PM) go to the best area that you think fit you very well... ure the effin client of cos u can layan lowyat maaaa,,,naval arch somme more example: I like to do hands on + technical on offshore structure... So I join Engineering+Construction div.. in the mean time, I learn on installation and operation of equipment (Tandem Mooring System, Lifeboat and Rescue boat, All Fire Fighting Equipments, Turret and Mooring System, Swivel System for Production, water Injection, umbilical, fibre optic, High and low voltage Swivel, SSIV HPU and its system, riser, anchor, winches, Swivel oil system, fluid buffer system, helideck and etc) that I taken care.. So that I will not have any problem to do Engineering, Construction, Operation and Project Management.. Expand your contacts locally and internationally... So far so good.. We manage to delivered 4 FPSOs and 1 FSO.. 1 FPSO is under construction.. and I still manage to layan Low yat.. and you will receive so many calls and emails from headhunters.. and now I'm working at oversea (across 2nd link) for Malaysia MNC... |
|
|
|
|
|
Jan 18 2013, 12:39 AM
Return to original view | Post
#7
|
![]() ![]()
Junior Member
92 posts Joined: Jul 2007 From: Jerusallem, Palestine |
QUOTE(goldezblack @ Jan 17 2013, 10:24 PM) Hai guys.. I really2 need opinions regarding this.. 1. Kindly enough for sponsorship but u are bonded for 10 years, assume u start from foundation studies. In 10 years u jump2 sure can beat petronas payI'm one of PETRONAS scholar that was recently graduated (Oct. 2012) from local university and my background is in Electrical & Electronics Eng major in Instrumentation & Control. I have passed PETRONAS structured interview and within 6 months (from 1st Oct. 2012), HR will try to find the placement for me either at the headquarter or their subsidiaries. Unfortunately, till now, 3 months + already, there still no job offer for me from PETRONAS. Should i wait, or just apply for other company. Btw, previously i have done my industrial internship with Baker Hughes under drilling & drill bit systems dept. My questions; 1) Should i wait for PETRONAS? I really didn't intend to breach the contract since they are kindly enough to sponsor for my degree. 2) Should i just apply back at Baker Hughes for field engineer position? Till now i didn't apply any position at Baker because the last time i contact with HR, they need to see release letter from my sponsor before they can offer a position to me. Help me please... Thanks 2. Even u r recommended, there is still risk. U dont know where they gonna placed u. Fingers crossed not for dagangan, supply chain etc. Accept or reject the offer. 3. U should not waiting for them at the first place. U just chillax dont need money after grad? My friend 1 year then HR call for placement. Dont waste ur time, go find some professional job and never mention u r bonded All the stories based on true event |
|
|
Feb 22 2013, 12:14 AM
Return to original view | Post
#8
|
![]() ![]()
Junior Member
92 posts Joined: Jul 2007 From: Jerusallem, Palestine |
QUOTE(InF.anime @ Feb 21 2013, 02:26 AM) Do you guys know how is the salary range for project planner for EPCC? What type of EPCC? Skid? Modules? Offshore pltfm? Onshore plant?not project engineer.. thanks What I know for project specific position is depends on size of company and project value in RM QUOTE(Dagger69 @ Feb 21 2013, 04:35 PM) Hmm valve engineer? Most likely to spend lots of time looking at catalogs. Y looking at catalogs? Shopping or wat..I thought they design the valve..sizing, specs etc..Anyway bro stefanov, what are you currently doing? |
|
|
Jun 3 2013, 10:09 AM
Return to original view | Post
#9
|
![]() ![]()
Junior Member
92 posts Joined: Jul 2007 From: Jerusallem, Palestine |
QUOTE(thesnake @ Jun 2 2013, 08:22 AM) well, some issues need onshore support as well, and depending on individual workpacks of the work order on how well the material readiness is, and also manpower estimation. Not to forget, project delay is also caused by weather as well QUOTE(thesnake @ Jun 2 2013, 12:32 PM) Gumusut has high safety requirement which requires rounds of procedures and checklists first before executing anything. This greatly contributes to the delays on the project. All project, EPC its always killed by Detail Design + Procurement ...If dwgs & material ready, all things can be made..i mean good AFC dwgs |
|
Topic ClosedOptions
|
| Change to: | 0.0210sec
0.67
7 queries
GZIP Disabled
Time is now: 1st December 2025 - 08:32 AM |