Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed

Outline · [ Standard ] · Linear+

 Oil & Gas Career v4, Technical Sharing & Career Opportunities

views
     
thesnake
post Jan 22 2013, 07:19 PM

On my way
****
Junior Member
613 posts

Joined: Jun 2011



usually only 2-3 weeks max for me, cannot tahan more than that cos away from gf and family
thesnake
post Apr 8 2013, 11:37 PM

On my way
****
Junior Member
613 posts

Joined: Jun 2011



^ thats very unprofessional of them. Kinda reminded me of their behavior during my engagement with them.
thesnake
post Jun 2 2013, 08:22 AM

On my way
****
Junior Member
613 posts

Joined: Jun 2011



QUOTE(echobrainproject @ Jun 2 2013, 07:55 AM)
throw everythng to HUC team to solve  cry.gif
*
well, some issues need onshore support as well, and depending on individual workpacks of the work order on how well the material readiness is, and also manpower estimation. Not to forget, project delay is also caused by weather as well biggrin.gif
thesnake
post Jun 2 2013, 12:32 PM

On my way
****
Junior Member
613 posts

Joined: Jun 2011



QUOTE(abgkik @ Jun 2 2013, 10:56 AM)
wink.gif  Cendor... Gemusut-Kakap..
*
Gumusut has high safety requirement which requires rounds of procedures and checklists first before executing anything. This greatly contributes to the delays on the project.
thesnake
post Jun 2 2013, 02:04 PM

On my way
****
Junior Member
613 posts

Joined: Jun 2011



QUOTE(abgkik @ Jun 2 2013, 01:04 PM)
oh come on...  doh.gif
*
Successfully executing a project is really not easy, especially the size of Gumusut. I can safely say deepwater in Malaysia still has a long way to go, however we must be optimistic to see this through. Imagine the shallow water complexes and mid-size FPSOs we have here is really nothing to the scale of these deep-water beasts, and that already we already have a hard time managing these projects.

All level of technical and non-technical personnel must really know their roles and responsibility in executing these projects if you really want to see a successful project completion ( Front-end development and design all the way to HUC), and from my experience, its not really easy when all of these people come together from different disciplines to work together as a team. Safety is also another thing, whereby its a priority before everything else. In the field of offshore projects, I can safely see these are the challenges we all face.
thesnake
post Jun 2 2013, 08:51 PM

On my way
****
Junior Member
613 posts

Joined: Jun 2011



QUOTE(meonkutu11 @ Jun 2 2013, 07:06 PM)
Gemusut-kakap gamnam sytle...
*
that video is really thumbup.gif

Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0523sec    0.37    7 queries    GZIP Disabled
Time is now: 1st December 2025 - 05:09 AM