i'm glad to see some fellow R2 and SW owners here. I collected my keys on sat and submitted an official complaint letter today. below is my list of common area "defects" which i've seen (pics taken as of 2nd Feb i'll try to upload tomorrow...)
- Unfinished electronic parking entry and exit management system
- Uncovered manhole at level 7, children’s playground area
- Uncovered manhole at level 7, beside the Jacuzzi
- Missing fire retardant and water hose nozzle at level 7, common area
- Exposed floor electrical wiring at the lower ground, lobby area
- Missing fittings (furniture, security desk) at the lower ground, lobby area
- Unfinished games and reading room at level 7, common area
- Missing tap, water supply for the washing basin at level 7, common area
today i saw that the parking at G is still blocked with Tiles and equipment making entry to LG impossible, for the first entrance. second entrance still ok. also i see that the parking entry system is up and on standby today.
when i submitted the letter, the lady was very helpful and told me that only 4 ppl from R3 complained about the management fees and they are still fighting about it till now. she also mentioned that they rushed the VP so that they don't have to pay penalties.
i think this is very unfair and the management should be aware of this, already now they are kicking the issue back between management and developer and i hope more owners will come forward to complain.
I'm on level 16 facing the park btw
This post has been edited by tylerng: Feb 4 2013, 12:58 AM
Feb 4 2013, 12:49 AM
Quote
0.0391sec
0.66
7 queries
GZIP Disabled