Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed

Outline · [ Standard ] · Linear+

 Kiara Residence 2, Bukit Jalil / Bukit OUG v2, A concept quadrant zone living in BJ

views
     
SAHM
post Apr 19 2015, 03:32 PM

Getting Started
**
Junior Member
204 posts

Joined: May 2014
QUOTE(twincharger07 @ Apr 19 2015, 11:50 AM)
seems there is a new proposed MRT2 line to accomodate HSR main terminal, which likely to be at Bandar Malaysia (sg besi airbase)
route from TRX, passing HSR, kuchai lama, SRI PETALING, serdang raya and end at putrajaya..

http://www.orientaldaily.com.my/index.php/central/zm800649

if this is materialized, more bonus for BJ, sri petaling and oug folks..  smile.gif
*
Anyone knows which part of the Kuchai Lama could it be? hmm.gif

This post has been edited by SAHM: Apr 19 2015, 03:33 PM
SAHM
post Apr 19 2015, 03:39 PM

Getting Started
**
Junior Member
204 posts

Joined: May 2014
QUOTE(Xccess @ Apr 18 2015, 10:23 AM)
The LRT station behind KR2 is looking good. Not sure if all LRT stations have the same design.
*
Not all. There will be a transit oriented development link to this station.

Ya, passed by yesterday. Looking good. thumbup.gif

SAHM
post Apr 19 2015, 06:03 PM

Getting Started
**
Junior Member
204 posts

Joined: May 2014
QUOTE(ronn77 @ Apr 19 2015, 03:44 PM)
Awan Basar is one of main station due to park and ride concept, not to be forgotten with some commercial development beside piece of land at LRT there to make it more happening. The progress of KR2 seems very fast, now reaching the rooftop and looks like all should be be completed by year end as schedule. If the LRT operational by this year end then it will benefited KR2 and surroundings. For investor, easier to get tenant too wink.gif
*
Fast meh? Actually doubt whether it can be vp by year end.
Anw, no hurry. biggrin.gif
SAHM
post Apr 19 2015, 06:28 PM

Getting Started
**
Junior Member
204 posts

Joined: May 2014
QUOTE(twincharger07 @ Apr 19 2015, 06:19 PM)
606psft for type A quite exceeding my expectation. I am expecting between 500 to 550psft given the abundance supply and leasehold title. anyway, hope for the best smile.gif
*
I remember there is limited type A units. Not available in all the 3 blocks, rite? Was it only T2?
SAHM
post Apr 19 2015, 11:57 PM

Getting Started
**
Junior Member
204 posts

Joined: May 2014
QUOTE(Chris Chew @ Apr 19 2015, 09:35 PM)
Type A has the most units, 50% of the 720 units.

Its only available at Tower 1 and 2, with 6 units out of 8 per floor.
*
thanks.

6 out of 8? Didnt know about this. Forgotten.

i tot i was looking at this smaller size, T2 facing pool, and it was sold out during pre-launch. LRT facing still a lot of units available though at that point of time.

Do u reckon that VP can be handed over in 6 months time?

SAHM
post Apr 20 2015, 12:51 PM

Getting Started
**
Junior Member
204 posts

Joined: May 2014
QUOTE(Chris Chew @ Apr 20 2015, 12:43 AM)
Yes. To recall ...

All Towers have 8 units per floor and 30 floors each.

Tower 1 and 2 is similar masterplan, sharing the same main lobby, both towers with 6 units of Type A, 1 unit of Type B and 1 unit of Type C. Both B and C are corner units facing Pool / Kesas only.

Thus, small size had more units facing LRT / Bkt Jalil ( about double to facing Pool / Kesas ) and hence it sell slower compare to the opposite as well as Tower 2 low floor units directly hit LRT rooftop, but it doesnt too slow as it was quickly snapped up with 2 weeks after actual launching weekend.

Tower 3, private main lobby, thus selling price from developer was RM 20k higher for each unit and only 4 units of Type C ( all corners ) and the rest of 4 units are only Type B, no small size here.

They can rush Rimba Residence so fast, if they really put more effort and worry to pay more LPI on late delivery, 6 mths is definitely more than enough to finish off the facilities area, top floors, guardhouse and etc.
*
thanks. Really it has been long time.

yes, facing lrt units though quite a number of units available during the preview day, were snapped up very fast. I was lucky to have a pool-facing unit released on the 2nd day of the preview.

on the 6 mths for vp. I think they will really try hard to complete. I am sceptical though. Wonder whether a lot of units due for vp in Nov ?

SAHM
post Apr 20 2015, 09:51 PM

Getting Started
**
Junior Member
204 posts

Joined: May 2014
QUOTE(Chris Chew @ Apr 20 2015, 06:19 PM)
Hmm, I avoid pool facing unit that time due to mainly Kesas Highway for dust and not really bcz of noise. Furthermore, pool or facilities arra located at lower ground 5 levels below condominium Level 1 and the sight was buffer by the 2 lanes road which leads to parking.

Level 1-3 units, I dont think can see the pool. Level 4-5 maybe can see half. Middle level say level 10-15, it suppose can see by looking down but its already 15-20 floors above the pool, so .... Ntg much can see except KL view.

Type A face pool should be on edge or advantage due to only 2 units per floor facing it ( total 4 and 8 units facing LRT / Bkt Jalil ) while my Type C is diff, only 2 units facing LRT / Bkt Jalil for entire 3 towers and 4 units facing Pool or Kesas.
*
Ya, 2 units only right? Can't recall. But i remember very limited choice.

i wanted the pool facing, not exactly for pool view, KL view actually. I went to the site and and decided to go for high floor to avoid the chances of view blocked by the apartment / condo across the highway. So, ended up high floor. Not so worried about the noise as this is considered further from the kesas, as compared to, for example, Z Res , (facing Kesas units). Furthermore, mine is a high floor unit.

SAHM
post Jun 26 2015, 08:00 PM

Getting Started
**
Junior Member
204 posts

Joined: May 2014
Heh! Kochin, sold ur BJ unit ke? Mind to share what is the market price now?
SAHM
post Jun 29 2015, 04:33 PM

Getting Started
**
Junior Member
204 posts

Joined: May 2014
Anyone knows about the development on that piece of land directly next to KR2? linked to the LRT station.
SAHM
post Jun 29 2015, 05:01 PM

Getting Started
**
Junior Member
204 posts

Joined: May 2014
QUOTE(ronn77 @ Apr 19 2015, 03:44 PM)
Awan Basar is one of main station due to park and ride concept, not to be forgotten with some commercial development beside piece of land at LRT there to make it more happening. The progress of KR2 seems very fast, now reaching the rooftop and looks like all should be be completed by year end as schedule. If the LRT operational by this year end then it will benefited KR2 and surroundings. For investor, easier to get tenant too wink.gif
*
The commercial development. Was told that an impressive mega high end development is in the pipeline. The first phase, should be the one next to KR2, a service apartment project. Anyone has further details? Just wonder whether this will add value to KR2. biggrin.gif

SAHM
post Sep 15 2015, 11:54 AM

Getting Started
**
Junior Member
204 posts

Joined: May 2014
QUOTE(wiranoob @ Sep 13 2015, 01:26 AM)
Hey guys.. I've check through the S&P. Under the attached second schedule, got list out the common facilities & services as per the followings:-
1) swimming pool
2) gymnasium
3) sauna
4) lounge area
5) landscape park with water feature
6) cafeteria
7) multipurpose hall
8) reading room
9) activity room
10) children playground
11) kindergarden
12) launderette
13) convenient shop
14) management office
15) surau
16) ritual yard
17) guard house

Besides that, there were also attachement of the plan layout, showing clearly those common area facilities.
Therefore, how come the developer can change from something to nothing (omission)?? Do our S&P good enough to sue them??
*
Mind to share what is missing? Just wonder, do we know what is missing at this stage? biggrin.gif
SAHM
post Sep 22 2015, 03:52 PM

Getting Started
**
Junior Member
204 posts

Joined: May 2014
Look like no way they can hand over vp in 1.5 months time? When is the picture taken?
SAHM
post Sep 22 2015, 10:58 PM

Getting Started
**
Junior Member
204 posts

Joined: May 2014
QUOTE(elmond @ Sep 22 2015, 10:22 PM)
you will be surprise, it's plan even shorter than 1.5 months
*
Really? surprise indeed if the photos are taken just recently. rclxub.gif

SAHM
post Oct 30 2015, 03:10 PM

Getting Started
**
Junior Member
204 posts

Joined: May 2014
QUOTE(Chris Chew @ Oct 30 2015, 02:58 PM)
Initial maintenance fee is RM 0.20 psf, but this developer a bit old school and very confusing , not only using sq mtr for conversion, to add on the fuel to most owners, 2 or 3 car parks also required to pay maintenance fee.

Mine is 2 car parks, all in about RM 0.25 psf, I think RM 0.26 to RM 0.27 psf for 3 car parks.
*
The Total Area with carpark ( sq m) is stated in the Property Management Billing. I count backwards, I think is Rm0.20 psf, including the carpark area.

I just called developer office. They have yet to receive any payment from bank. So no point going to their office now.
biggrin.gif


Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0540sec    0.73    7 queries    GZIP Disabled
Time is now: 8th December 2025 - 12:03 PM