Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed

Outline · [ Standard ] · Linear+

 LYN Proton INSPIRA Owners and Fans Thread V43!, Fastest thread in F&F, just like the car

views
     
Xabi14Alonso
post Jul 24 2012, 09:17 PM

New Member
*
Newbie
1 posts

Joined: Nov 2011
Wah..V43 already..congrats guys..but fastest thread in F&F..just like the car??..u sure or not?? Vios don't have any in F&F?? Hehehe..
Xabi14Alonso
post Jul 24 2012, 09:22 PM

New Member
*
Newbie
1 posts

Joined: Nov 2011
QUOTE(Xai-V-iaX @ Jul 24 2012, 09:14 PM)
Now...this is how our LYNSPIRA car stickers should be like !!!!! tongue.gif
*
Nice..book me one..
Xabi14Alonso
post Aug 1 2012, 10:22 PM

New Member
*
Newbie
1 posts

Joined: Nov 2011
Done Sierra Glow today..turn out that William is famous there.. cool2.gif

Xabi14Alonso
post Aug 1 2012, 10:42 PM

New Member
*
Newbie
1 posts

Joined: Nov 2011
QUOTE(david_ngcw @ Aug 1 2012, 10:32 PM)
wah...like that inspira go there mah...kena bashing...habis my 5 year warranty
*
No la..William got a good reputation there..among the staff there la..with the boss i dont know la..
Xabi14Alonso
post Aug 8 2012, 09:55 AM

New Member
*
Newbie
1 posts

Joined: Nov 2011
Guys..just sharing..true or not I don't know.

Berikut diberikan lokasi-lokasi pemasangan sistem baru speed trap yang telah dipasang oleh pihak PDRM:

PLUS Arah Utara
■Under a bridge at about 456km, Sg Buloh junction.
■Under a bridge at about 459km, Bukit Lanjan interchange.
■Under the overhead restaurant at Sg Buloh.
■Under the last bridge before Sg Besi toll at 309.2km.
■Under the bridge at 296.5km, Bangi junction.
■Under the newly constructed bridge at 289.0km, after Nilai North junction.
■Under the bridge at 286.5km, Nilai North junction.

PLUS Arah Selatan
■Below signboard at about 454.6km and 455.2km, Sg Buloh layby.
■Under the bridge after Subang junction at 11.3km.
■Under the bridge at 22km, Bukit Lanjan junction.
■Under the bridge before Mint hotel, Sg Besi Toll. 80km/h only!
■Under the bridge at 302.8km, Kajang junction.
■About 1km south of Bangi junction, both south and north bound outer lanes
■At 296.5km and 297km, Bangi junction.
■Under the newly constructed bridge at 289.0km, before Nilai North junction.
■At 285.5km and 285.8km, Nilai North junction.
■On center divider at 251.8km and 253km after Senawang junction.
■After Alor Gajah junction at 213.9km, next to water theme park.
■Behind the right hand crash barrier at 198.4km.

Lebuhraya Elite Hubungan Timur Tengah/Utara
■On left hand side at 4.8km after Batu Tiga/Shah Alam exit
■Under the overhead restaurant at USJ/Hicom junction about 8.5km. 90km/h zone!
■Below the bridge before USJ/Hicom junction at 10.5km.

Lebuhraya Elite Hubungan Barat Tengah/Selatan
■Under the overhead restaurant at USJ/Hicom junction about 8.5km. 90km/h zone!
■Below the bridge before USJ/Hicom junction at 10.5km.
■After exit from KLIA toll to the airport, below Jalan Pekeliling flyover.90km/h

NKVE Arah Timur/Utara
■300m before Jalan Duta toll, 60km/h!
■Behind crash barrier on the left when going towards Jalan Duta toll, at 24.9km, 80km/h!
■Below bridge at Damansara Junction, 17.5km

NKVE Arah Barat/Selatan
■Behind crash barrier on the left when leaving Jalan Duta toll from KL, at 25.3km and 25.7km, 80km/h!
■From Jln Duta, below the bridge, 23km, 80km/h zone!
■From Jln Duta, at the underpass at Sg Buloh Y-junction, 22km.
■Behind crash barrier at Damansara Junction, 17.7km and 16.8km
■Below railway bridge at 11.2km
■Under the bridge at Shah Alam junction.

Lebuhraya Kesas Timur
■Under the bridge at 44.8km, downhill run after Puchong junction.
■Kesas West Bound
■At Sg Besi side of East Bound Toll. Kuala LumpurCity
■Jalan Duta; below the flyover at the Damansara junction, 70km/h zone.
Lebuhraya Kesa – Klang
■Dual carriageway between Klang and Port Klang. Towards Klang direction, at about 13km mile stone. 70km/h only!

Leburaya Pantai Timur
■East bound, downhill run after Raub junction.
■Maran, 60km/h zone.
■Paya Bungor, 70km/h zone.

Kawasan Negeri Johor Arah Selatan
■Tangkak junction.
■Under the bridge after Yong Peng
■North junction at 97.3km.
■Ayer Hitam junction.
■Sedenak junction.

Jalanraya Sekitar Utara Malaysia – Arah Utara
■Around Ayer Hitam in 60km/h zone.
■Before Perwaja Steel.
■Sg Petani junction.
■Between Seberang Jaya junction and Sg Dua Toll.
■Penang Bridge at island end.Speed limit 80km/h.

Jalanraya Sekitar Utara Malaysia – Arah Selatan
■Penang Bridge Island end. Speed limit 80km/h.
■About 2km before Juru Toll Speed limit 90km/h.

Kawasan Perak Jalanraya Arah Utara
■Under the bridge at 197.1km and 198.8km, afterKamunting Junction.
■Under the bridge at 204.3km, after KamuntingJunction.
■Under the bridge at 208km, before Kamunting Junction.
■Under the bridge at 214.8km, before Kamuntingjunction.
■Ipoh Vista Point at about 263km. Speed limit 80km/h.
■Under the bridge at 271km, Ipoh North Junction.
■Under the bridge at 274.4km, Ipoh South Junction.
■Under the bridge at 286.9km, Simpang Pulai Junction.
■Under the bridge at 296km, Gopeng Junction.
■Under the bridge at 352.6km, after Sungkai Junction.
■Under the bridge at 353km, Sungkai Junction.
■Under the bridge at 373km, Slim River Junction.

Kawasan Perak Arah Selatan
■Under the bridge at 199km, before Kamunting junction.
■Under the bridge at 241.9km, at Kalau Kangsarjunction.
■Under the sign post at 296.1km, before GopengJunction.
■Under the bridge at 297km, at Gopeng Junction.
■Under the bridge at 300km, after Gopeng junction.
■Under the bridge at 308.6km, after Gopeng junction.
■Under the bridge at 372.6km, at SlimRiverjunction



Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0182sec    0.76    7 queries    GZIP Disabled
Time is now: 11th December 2025 - 10:30 AM