 Alam impian Pentas Superlink V2, Pentas series discussion

views
     
AMINT
post Dec 25 2012, 05:17 PM

Look at all my stars!!
*******
Senior Member
7,446 posts

Joined: Sep 2008
QUOTE(Lionking1900 @ Dec 25 2012, 05:09 PM)
What i understand from the site, that the contractors have TNB issue.
*
What sort of TNB issue, bro?
Lionking1900
post Dec 25 2012, 05:30 PM

Regular
******
Senior Member
1,286 posts

Joined: Nov 2010
QUOTE(AMINT @ Dec 25 2012, 05:17 PM)
What sort of TNB issue, bro?
*
The top three (3) TNB most common to say:....

1. Tiada Transformer (which to be installed in TNB substation @ PE)
2. Tiada cable
3. Tiada tiang (for expose cabling)
AMINT
post Dec 25 2012, 05:35 PM

Look at all my stars!!
*******
Senior Member
7,446 posts

Joined: Sep 2008
QUOTE(Lionking1900 @ Dec 25 2012, 05:30 PM)
The top three (3) TNB most common to say:....

1. Tiada Transformer (which to be installed in TNB substation @ PE)
2. Tiada cable
3. Tiada tiang (for expose cabling)
*
hmmm. hopefully settle faster.
Lionking1900
post Dec 25 2012, 05:36 PM

Regular
******
Senior Member
1,286 posts

Joined: Nov 2010
For pentas 2 owner,....

A good news... (note: this message is applicable only to early buyer)

1. Pentas 2, the building works shall be ready by March 2013
2. But due to TNB issue, i think still can enjoy 2 - 3 months free interest
3. VP..... I target June or July
4. If can delay to Nov 2013, lebih syok and baik la ~~~ wakakaka


Added on December 25, 2012, 5:38 pm
QUOTE(AMINT @ Dec 25 2012, 05:35 PM)
hmmm. hopefully settle faster.
*
I have a project, which i paid the TNB contribution more than 2 million. They only started work 6 months I paid and completed another 3 months..... vmad.gif vmad.gif vmad.gif vmad.gif

This post has been edited by Lionking1900: Dec 25 2012, 05:39 PM
nkhong
post Dec 26 2012, 03:15 AM

Look at all my stars!!
*******
Senior Member
2,442 posts

Joined: Jan 2009
Lion taiko,

How soon pentas 1 going to be VP? Any idea? 2 month or 3 minths from now?

Lionking1900
post Dec 26 2012, 09:38 AM

Regular
******
Senior Member
1,286 posts

Joined: Nov 2010
QUOTE(nkhong @ Dec 26 2012, 03:15 AM)
Lion taiko,

How soon pentas 1 going to be VP? Any idea? 2 month or 3 minths from now?
*
The building works for pentas 1 nearly 90% completed. But... I dont kam-ching with pentas 1 contractor. So... no info for you... soli soli
AMINT
post Dec 26 2012, 09:41 AM

Look at all my stars!!
*******
Senior Member
7,446 posts

Joined: Sep 2008
Guys, just wanna ask your opinion. Is it better to kautim with pentas 1 contractor to do my renovation or straight to taikor of renovation like GDY construction and design?

And one more thing, do you guys have AI masterplan that is big in size. On the net got also but damn small. if zoom, becomes blur
M2K2Land
post Dec 26 2012, 09:51 AM

Inevitable 忍者
*******
Senior Member
2,407 posts

Joined: Apr 2006
QUOTE(Lionking1900 @ Dec 25 2012, 05:36 PM)
For pentas 2 owner,....

A good news... (note: this message is applicable only to early buyer)

1. Pentas 2, the building works shall be ready by March 2013
2. But due to TNB issue, i think still can enjoy 2 - 3 months free interest
3. VP.....  I target June or July
4. If can delay to Nov 2013, lebih syok and baik la ~~~ wakakaka


Added on December 25, 2012, 5:38 pm

I have a project, which i paid the TNB contribution more than 2 million. They only started work 6 months I paid and completed another 3 months.....  vmad.gif  vmad.gif  vmad.gif  vmad.gif
*
Due to delay of my Loan Lawyer (RM1700 for late charges bare by the loan lawyer), My disbursement date is on June. However I call up I&P, they say inform bank to issue interest charges to I&P on 31 March 2013 (which this should be the date of the disbursement). Phewwww... now waiting Bank Management confirmation of the letter.
Lionking1900
post Dec 26 2012, 09:52 AM

Regular
******
Senior Member
1,286 posts

Joined: Nov 2010
QUOTE(AMINT @ Dec 26 2012, 09:41 AM)
Guys, just wanna ask your opinion. Is it better to kautim with pentas 1 contractor to do my renovation or straight to taikor of renovation like GDY construction and design?

And one more thing, do you guys have AI masterplan that is big in size. On the net got also but damn small. if zoom, becomes blur
*
I suggest you that, if you want to do the renovation after VP, engage renovation contractor lo. Because ah, the pentas 1 contractor will move the whole world to other site. Left only few indons to take care the site.
Unless, you want to do now before VP....


Added on December 26, 2012, 9:53 am
QUOTE(M2K2Land @ Dec 26 2012, 09:51 AM)
Due to delay of my Loan Lawyer (RM1700 for late charges bare by the loan lawyer), My disbursement date is on June. However I call up I&P, they say inform bank to issue interest charges to I&P on 31 March 2013 (which this should be the date of the disbursement). Phewwww... now waiting Bank Management confirmation of the letter.
*
How to get that letter ah? I also want

This post has been edited by Lionking1900: Dec 26 2012, 09:53 AM
AMINT
post Dec 26 2012, 09:56 AM

Look at all my stars!!
*******
Senior Member
7,446 posts

Joined: Sep 2008
QUOTE(Lionking1900 @ Dec 26 2012, 09:52 AM)
I suggest you that, if you want to do the renovation after VP, engage renovation contractor lo. Because ah, the pentas 1 contractor will move the whole world to other site. Left only few indons to take care the site.
Unless, you want to do now before VP....


Added on December 26, 2012, 9:53 am

How to get that letter ah? I also want
*
ooo ok. in that case i better engage renovation contractor. What letter is that aa?
Lionking1900
post Dec 26 2012, 09:58 AM

Regular
******
Senior Member
1,286 posts

Joined: Nov 2010
QUOTE(AMINT @ Dec 26 2012, 09:56 AM)
ooo ok. in that case i better engage renovation contractor. What letter is that aa?
*
Neh....those S&P lauya la. Do thing slow slow, we kena charged interest by I&P. So, the truth is that S&P lauya do thing slow slow, so the lauya to pay our interest lo.
AMINT
post Dec 26 2012, 09:59 AM

Look at all my stars!!
*******
Senior Member
7,446 posts

Joined: Sep 2008
QUOTE(Lionking1900 @ Dec 26 2012, 09:58 AM)
Neh....those S&P lauya la. Do thing slow slow, we kena charged interest by I&P. So, the truth is that S&P lauya do thing slow slow, so the lauya to pay our interest lo.
*
Oooo S&P issue la. I faced that problem too but it was my banker. Russia Hidung Besar. Just 14 days left before I kena last payment charges.
Lionking1900
post Dec 26 2012, 10:01 AM

Regular
******
Senior Member
1,286 posts

Joined: Nov 2010
So har...because is I&P punya lauya buat kacau. Suppose to serve interest from March 2012, but only start to pay in May 2012. So, our DIBS should be in March 2013, correct boh?
M2K2Land
post Dec 26 2012, 10:25 AM

Inevitable 忍者
*******
Senior Member
2,407 posts

Joined: Apr 2006
I just called Puan Norisa (I&P) and she tell me Buyer should call bank sleep.gif for below 2 items

1) Bank should issue the letter to I&P before 31 March 2013 saying DIBS started), so I&P can prepare the money

2) Buyer who affected by delay should call bank and tell the bank charge I&P (After 31 March 2013, which affected by the delay)

jucl
post Dec 26 2012, 10:28 AM

Regular
******
Senior Member
1,379 posts

Joined: Nov 2011


QUOTE(AMINT @ Dec 26 2012, 09:56 AM)
ooo ok. in that case i better engage renovation contractor. What letter is that aa?
*
Bro Amint. If you know of a good contractor lemme know also. Coz I heard so many scary case about renovation contractor. By the way, r u engaging any Interior designer?
I guess u can only start to renovate after inp rectify all defects right? Otherwise after renovation they wun take any responsibilty.
AMINT
post Dec 26 2012, 10:35 AM

Look at all my stars!!
*******
Senior Member
7,446 posts

Joined: Sep 2008
QUOTE(jucl @ Dec 26 2012, 10:28 AM)
Bro Amint. If you know of a good contractor lemme know also. Coz I heard so many scary case about renovation contractor. By the way, r u engaging any Interior designer?
I guess u can only start to renovate after inp rectify all defects right? Otherwise after renovation they wun take any responsibilty.
*
I did talked to a few interior designer but i do design on my own too by myself as i know i will be satisfied with my own work. yes, wait until I&P rectify first before doing anything. remember to sambung air and electric fast. and 1-2 days stay there. open tap for those days to check the leaks. (yes, ur water bill will become crazy but it is necessary) i did a mistake once in one of my props by not doing this. only after everything sambung, i noticed got leaks everywhere. wtf. that time warranty period ended already.

This post has been edited by AMINT: Dec 26 2012, 10:36 AM
M2K2Land
post Dec 26 2012, 11:36 AM

Inevitable 忍者
*******
Senior Member
2,407 posts

Joined: Apr 2006
QUOTE(AMINT @ Dec 26 2012, 10:35 AM)
I did talked to a few interior designer but i do design on my own too by myself as i know i will be satisfied with my own work. yes, wait until I&P rectify first before doing anything. remember to sambung air and electric fast. and 1-2 days stay there. open tap for those days to check the leaks. (yes, ur water bill will become crazy but it is necessary) i did a mistake once in one of my props by not doing this. only after everything sambung, i noticed got leaks everywhere. wtf. that time warranty period ended already.
*
AMINT tai kor... can i just curi abit ur design so i can save the money for hired interior designer? I spend u teh tarik la... tongue.gif
AMINT
post Dec 26 2012, 11:43 AM

Look at all my stars!!
*******
Senior Member
7,446 posts

Joined: Sep 2008
QUOTE(M2K2Land @ Dec 26 2012, 11:36 AM)
AMINT tai kor... can i just curi abit ur design so i can save the money for hired interior designer? I spend u teh tarik la... tongue.gif
*
check pm
jucl
post Dec 26 2012, 11:51 AM

Regular
******
Senior Member
1,379 posts

Joined: Nov 2011


QUOTE(AMINT @ Dec 26 2012, 10:35 AM)
I did talked to a few interior designer but i do design on my own too by myself as i know i will be satisfied with my own work. yes, wait until I&P rectify first before doing anything. remember to sambung air and electric fast. and 1-2 days stay there. open tap for those days to check the leaks. (yes, ur water bill will become crazy but it is necessary) i did a mistake once in one of my props by not doing this. only after everything sambung, i noticed got leaks everywhere. wtf. that time warranty period ended already.
*
Oh, you mean you need to open water tab for one day to check pipe leak. Habis lah my water bill..huhuhu


Added on December 26, 2012, 11:52 am
QUOTE(AMINT @ Dec 26 2012, 11:43 AM)
check pm
*
Not fair. I want one too! Can pm ah hehe

This post has been edited by jucl: Dec 26 2012, 11:52 AM
AMINT
post Dec 26 2012, 11:53 AM

Look at all my stars!!
*******
Senior Member
7,446 posts

Joined: Sep 2008
QUOTE(jucl @ Dec 26 2012, 11:51 AM)
Oh, you mean you need to open water tab for one day to check pipe leak. Habis lah my water bill..huhuhu
*
yes open water tab for 1 day to check pipe leak. yes water bill will be rm300-400. better do that to check bro. u might not know. rm300-400 are peanuts if you can afford pentas, right? tongue.gif