QUOTE(craftsnknots @ Jul 4 2012, 02:16 PM)
must think because contractor say plaster ceiling will be lower than if it is wall mouted ma...and I'm not sure of the electricity consumption..will I be using more electricity?
If i have 2 unit, then i can just turn on living or dining. If one unit cassette, it will attempt to cool both area when I spend most of the time in living room..aircon point is RM180 and to conceal piping with copper pipe of 0.61mm with 4 col wiring for 2.5hp is RM600, for 1hp is RM400, 1.5hp is RM450
Or maybe just 1 unit of 1.5 at the living, dining fix later just do wiring...wiring work for the entire house cost a bomb
If you have minimal 10' ceiling height than is not that bad. Anything lower don't think of using cassettes. If i have 2 unit, then i can just turn on living or dining. If one unit cassette, it will attempt to cool both area when I spend most of the time in living room..aircon point is RM180 and to conceal piping with copper pipe of 0.61mm with 4 col wiring for 2.5hp is RM600, for 1hp is RM400, 1.5hp is RM450
Or maybe just 1 unit of 1.5 at the living, dining fix later just do wiring...wiring work for the entire house cost a bomb
Depend your living room, of you have large area better user 2hp, + 1hp. That is my current setup too.
You can do wiring and conceal piping first.
Hehe, entire house wiring for double stories minimal 10k if you want to do it proper. Mine already more that that.
Jul 4 2012, 02:52 PM

Quote
0.0155sec
0.40
6 queries
GZIP Disabled