they actually exceed the capacity of the current lcct, need new terminal for growth.
plus malindo airways, if there is no new terminal sure sesak one.
the cost escalated due to the runway as it was built on kawasan paya so need more to strengthen the ground
KLIA2 construction Updates, The ultimate Thread
Feb 3 2013, 02:22 PM
Quote
0.0124sec
0.14
6 queries
GZIP Disabled