huge waste of money. no good end point la this 3rd runway. it's not like the existing 2 is over-utilised. this is malaysian logic.
KLIA2 construction Updates, The ultimate Thread
KLIA2 construction Updates, The ultimate Thread
|
|
May 31 2012, 06:59 PM
Return to original view | Post
#1
|
![]() ![]()
Junior Member
195 posts Joined: May 2010 |
huge waste of money. no good end point la this 3rd runway. it's not like the existing 2 is over-utilised. this is malaysian logic.
|
| Bump Topic Add ReplyOptions New Topic |
| Change to: | 0.0115sec
0.34
6 queries
GZIP Disabled
Time is now: 6th December 2025 - 01:34 AM |