> KLIA2 construction Updates, The ultimate Thread

views
     
Current Events guy
post Jun 1 2012, 11:01 AM

Enthusiast
*****
Junior Member
966 posts

Joined: Nov 2009
travel from the office building to the apron is about .75/1km. Sure all the engineers so malas to walk, they use the buggy.

Hopefully tony supply shuttle to and fro.
Current Events guy
post Jun 12 2012, 02:40 PM

Enthusiast
*****
Junior Member
966 posts

Joined: Nov 2009
sepang still **** place to live.

why eh? I thought closer to big project = better infrastructure = better lifestyle

Bandar enstek is meh

also, when this complete, Jun 2013 is it? Last time told me Aug 2012.

Ptuih MAB
Current Events guy
post Jun 12 2012, 02:54 PM

Enthusiast
*****
Junior Member
966 posts

Joined: Nov 2009
QUOTE(Cowhide @ Jun 12 2012, 02:52 PM)
the road to lcct, along the sepang stretch is uneven and cracked. Multiple re-tarring is ineffective.
*
I've only noticed this on the way out to the roundabout near the mosque if you are coming from lcct. Even then, it's only at the leftmost lane after the ERL bridge.
Current Events guy
post Jun 15 2012, 09:50 AM

Enthusiast
*****
Junior Member
966 posts

Joined: Nov 2009
The engineering bay is 1km away from the building compared to LCCT where it's not even 100m.

Expect long delays when an aircraft is grounded!