Outline ·
[ Standard ] ·
Linear+
KLIA2 construction Updates, The ultimate Thread
|
Cowhide
|
Jun 1 2012, 12:18 PM
|
|
QUOTE(mrg220t @ Jun 1 2012, 12:05 PM) Why is there a need for KLIA2 when KLIA itself is so underutilize. Why not merge LCCT and KLIA into 1 terminal? It really doesn't make any sense to have another airport JUST for low cost carriers (AA). It makes cents, if there is money to be made. Current LCCT is nearing capacity, with current facilities (ie; parking lots, chairs, McD). But to optimize current or to build new ...is all about money. This post has been edited by Cowhide: Jun 1 2012, 12:23 PM
|
|
|
|
|
|
Cowhide
|
Jun 12 2012, 02:52 PM
|
|
QUOTE(Current Events guy @ Jun 12 2012, 02:40 PM) sepang still **** place to live. why eh? I thought closer to big project = better infrastructure = better lifestyle Bandar enstek is meh also, when this complete, Jun 2013 is it? Last time told me Aug 2012. Ptuih MAB the road to lcct, along the sepang stretch is uneven and cracked. Multiple re-tarring is ineffective.
|
|
|
|
|
|
Cowhide
|
Jun 12 2012, 03:01 PM
|
|
QUOTE(Current Events guy @ Jun 12 2012, 02:54 PM) I've only noticed this on the way out to the roundabout near the mosque if you are coming from lcct. Even then, it's only at the leftmost lane after the ERL bridge. thats the spot, approx 1km worth of adrenaline driving.
|
|
|
|
|
|
Cowhide
|
Jun 12 2012, 03:02 PM
|
|
QUOTE(Kampung2005 @ Jun 12 2012, 02:48 PM) KLIA2 is nearer to KL, than LCCt by about 8-10km by road? This post has been edited by Cowhide: Jun 12 2012, 03:03 PM
|
|
|
|
|