 What is D.O. when in submission means ?, Submitting from an Architect Firm

views
     
TSzsnipes
post May 18 2012, 01:54 AM, updated 14y ago

Enthusiast
*****
Senior Member
878 posts

Joined: Aug 2008
May I know what is D.O. means ?
Normally submitted by an Architect Firm.

What is it stand for ?
Can someone briefly define D.O. requirement when doing submission to the authority ?
dumeort
post May 18 2012, 01:57 AM

Getting Started
**
Junior Member
120 posts

Joined: Mar 2009
Development Order.
TSzsnipes
post May 18 2012, 02:18 AM

Enthusiast
*****
Senior Member
878 posts

Joined: Aug 2008
QUOTE(dumeort @ May 18 2012, 01:57 AM)
Development Order.
*
What kind of drawings to be submitted when doing D.O. submission ?

I know BP (Building Plan) submission, which require,
eg. for bungalow need;
Key Plan, Location Plan, Site Plan, all Floors Plan, 4 Elevations, 2 Sections, Sanitary & Plumbing Layout Plan & Diagramatic Layout.

But How about D.O. submission? What is require ?
Any difference with BP submission ?

Thanks.
kochin
post May 18 2012, 08:32 AM

I just hope I do!
********
All Stars
10,319 posts

Joined: Dec 2009
From: Malaysia


QUOTE(zsnipes @ May 18 2012, 02:18 AM)
What kind of drawings to be submitted when doing D.O. submission ?

I know BP (Building Plan) submission, which require,
eg. for bungalow need;
Key Plan, Location Plan, Site Plan, all Floors Plan, 4 Elevations, 2 Sections, Sanitary & Plumbing Layout Plan & Diagramatic Layout.

But How about D.O. submission? What is require ?
Any difference with BP submission ?

Thanks.
*
DO-Development Order.
LCP-Laporan Cadangan Pemajuan or KM-Kebenaran Merancang

from what i hearsay, DO is required as prove of approval from the relevant authorities to grant you permission to build the proposed development.
DO would require the following among others;
landscaping input, on-site detention (for rainwater) plans, architectural layout & drawings, perspective, and of course KM or LCP report. some might require EIA input too.
good luck!
SUSNew Klang
post May 18 2012, 09:09 AM

Look at all my stars!!
*******
Senior Member
4,998 posts

Joined: Dec 2010
How about Land Surveyor's plan and report?
kochin
post May 18 2012, 09:12 AM

I just hope I do!
********
All Stars
10,319 posts

Joined: Dec 2009
From: Malaysia


QUOTE(New Klang @ May 18 2012, 09:09 AM)
How about Land Surveyor's plan and report?
*
that comes in much earlier for the architect to work on lah. else the architect wouldn't know where is the boundary also.
TSzsnipes
post May 19 2012, 01:36 AM

Enthusiast
*****
Senior Member
878 posts

Joined: Aug 2008
QUOTE(kochin @ May 18 2012, 08:32 AM)
DO-Development Order.
LCP-Laporan Cadangan Pemajuan or KM-Kebenaran Merancang

from what i hearsay, DO is required as prove of approval from the relevant authorities to grant you permission to build the proposed development.
DO would require the following among others;
landscaping input, on-site detention (for rainwater) plans, architectural layout & drawings, perspective, and of course KM or LCP report. some might require EIA input too.
good luck!
*
Wow, seems it need a lot more things to submit than the Building Plan submission.

When you say "architectural layout & drawings", is it same like the Building Plan submission ?
Once D.O. submission done, that's mean we can use back the same & change the title only for Building Plan submission ?

What is EIA input ?
kochin
post May 19 2012, 05:18 PM

I just hope I do!
********
All Stars
10,319 posts

Joined: Dec 2009
From: Malaysia


do drawings usually are more preliminary compared to BP drawings. BP drawings requires more details and planning.
EIA is environment impact analysis report.
some even required additional dependent on the actual site.
mavis99
post Nov 24 2017, 12:05 AM

New Member
*
Newbie
1 posts

Joined: Nov 2017


anybody know what is the definition of Development Order?
and the following :
-parties involved, responsible for submission
-document/form need to submit
-procedure
-which department in DBKL in charge of or receive the documents
-duration of getting approval from DBKL

 