 SkyPod Residences, Puchong Jaya

views
     
tmc
post Mar 14 2013, 05:52 PM

Regular
******
Senior Member
1,185 posts

Joined: Dec 2011
Progress update, picture quality scaled down.

Attached Image
tmc
post Mar 15 2013, 11:15 AM

Regular
******
Senior Member
1,185 posts

Joined: Dec 2011
QUOTE(kochin @ Mar 14 2013, 06:40 PM)
wah....sibeh fast progress.
really fast and furious ala puchong ioi style.
tmc boss, ada latest pricing update or not?
thanks.
*
Latest sales chart, scale down picture quality/size to fit lowyat forum, might be hard to read as result :-

Attached Image Attached Image
tmc
post Mar 15 2013, 12:10 PM

Regular
******
Senior Member
1,185 posts

Joined: Dec 2011
QUOTE(twincharger07 @ Mar 15 2013, 11:48 AM)
Puchong 700psft  notworthy.gif
*
Bigger built up more worth it psf-wise. For example, level 17 selling 669,800 for 1248 sf, that's 545 psf.
tmc
post Apr 27 2013, 11:35 AM

Regular
******
Senior Member
1,185 posts

Joined: Dec 2011
QUOTE(dc28yk @ Apr 27 2013, 09:41 AM)
Tower 2 build until lvl 5 already at actual site..
*
Floor number starts from 3, so in term of unit number its probably level 10 or something if you count the highest point.
tmc
post Sep 4 2013, 11:16 AM

Regular
******
Senior Member
1,185 posts

Joined: Dec 2011
Skypod Square open for registration.

I supposed it's the commercial units in skypod :-

http://www.skypod.com.my/concept.html
tmc
post Sep 6 2013, 10:32 AM

Regular
******
Senior Member
1,185 posts

Joined: Dec 2011
QUOTE(wil-i-am @ Sep 6 2013, 09:50 AM)
Does IOI offer any freebies to clear the remaining units?
*
Based on the little that I know in the recent event at IOI mall they offer some discount to IOI privilege card holders. Not sure if it is valid for this prop.

Did not check further.
tmc
post Sep 23 2013, 10:56 PM

Regular
******
Senior Member
1,185 posts

Joined: Dec 2011
Tower 1 progress, at level 3 only :-

Attached Image

This post has been edited by tmc: Sep 23 2013, 10:57 PM
tmc
post Dec 3 2013, 07:57 AM

Regular
******
Senior Member
1,185 posts

Joined: Dec 2011
QUOTE(syong888 @ Dec 2 2013, 09:44 PM)
user posted image
Overview
*
This picture the building at the far end under construction with a crane is tower 1, only constructed 3 levels ( 5th floor ).

tmc
post Dec 4 2013, 10:08 AM

Regular
******
Senior Member
1,185 posts

Joined: Dec 2011
QUOTE(kochin @ Dec 3 2013, 08:37 AM)
Huh? Why such a big disparity between progress of tower 1 & 2?
*
They have roughly 6 months to close the gap because tower 1 vp date is at least 6 months later than tower 2.
tmc
post Dec 4 2013, 10:11 AM

Regular
******
Senior Member
1,185 posts

Joined: Dec 2011
QUOTE(ecin @ Dec 3 2013, 01:17 PM)
ops, low floors see lorong only
*
So lower floor units are doomed ? sad.gif
tmc
post Aug 7 2014, 02:36 PM

Regular
******
Senior Member
1,185 posts

Joined: Dec 2011
QUOTE(syong888 @ Jul 5 2014, 02:05 PM)
Building painting of Tower 2 already reaching the top...
*
Construction still haven't reach 80%.

The interest bearing scheme is expiring soon.

Buyers have to start bearing their own interest payment to the bank.
tmc
post Aug 13 2014, 10:03 AM

Regular
******
Senior Member
1,185 posts

Joined: Dec 2011
QUOTE(syong888 @ Aug 8 2014, 09:10 PM)
VP by 2015???
*
QUOTE(Errie @ Aug 11 2014, 06:38 PM)
Developer told construction complete in 55% only.. But from the side photo it's seem like complete more than that.. Need to start paying loan interest next month onwards.. 😭
*
If they VP according to 3.5 year agreement, it will be december 2015. Maybe to pay for loan interest at least 1 year or more. Loan interest is heaviest as it gets closer to VP, so IOI's DIBS scheme is almost nothing.

This post has been edited by tmc: Aug 13 2014, 10:04 AM
tmc
post Aug 14 2014, 11:18 AM

Regular
******
Senior Member
1,185 posts

Joined: Dec 2011
If not mistaken it's expiring in the middle of the Sept month. So the interest will be pro-rated ? A portion will still go to developer ?

Is it possible to start dumping money into the loan ( before it is fully disbursed ) to reduce interest since the DIBS has expired ?
tmc
post Aug 18 2014, 04:10 PM

Regular
******
Senior Member
1,185 posts

Joined: Dec 2011
QUOTE(dc28yk @ Aug 13 2014, 04:02 PM)
Something is better then nothing.. hahaha
*
Less than 40% of loan has been disbursed. Got conned. cry.gif
tmc
post Aug 20 2014, 09:07 AM

Regular
******
Senior Member
1,185 posts

Joined: Dec 2011
QUOTE(dc28yk @ Aug 19 2014, 04:07 PM)
Yours is tower 1 or tower 2?
*
Something is not able to tally.

The progress letter showed with architect signature is right up to internal plastering, but the bank statement showed less than that has been disbursed.

The next progress is about the sewage, and the roads will be expected to be sometime in the future, pending completion of other units. Not so soon.

Anyway for now, the interest incurred is still minimal.
tmc
post Sep 3 2014, 06:59 AM

Regular
******
Senior Member
1,185 posts

Joined: Dec 2011
QUOTE(audy @ Sep 3 2014, 12:13 AM)
Does anyone know the closest possible completion date? I purchased my unit quite late and the sales lady said completion is mid 2015. I took her word for it as she is from the developer office but now someone here is saying it'll be end of 2015?

Also, in regards to interest payment, I was not entitled to the DIBS scheme and therefore has started paying interest and I must say it's very jialatt sad.gif
*
By contract, they are allowed to deliver upto the maximum time stipulated in the contract.

However, the sales lady maybe giving an estimate based on the current construction progress.

You got different answers because they are talking about different things.

tmc
post Sep 3 2014, 07:01 AM

Regular
******
Senior Member
1,185 posts

Joined: Dec 2011
QUOTE(kochin @ Aug 21 2014, 09:56 AM)
i did it before boss.
dump it amount during construction to ofset interest chargeable.
tongue.gif
*
Yes at least for my bank the officer said I could do it and it will offset the loan interest.

Can't say about other banks.
tmc
post Jul 22 2015, 12:28 PM

Regular
******
Senior Member
1,185 posts

Joined: Dec 2011
Had a chance to look at the inside of skypod.

Actually what's inside is not so bad. Ceiling is high for sure. Paint work looks good. Bathrooms furnishing reasonable. All the door handles, window handles etc smaller accessories I am ok with the quality as when you hold them if feels solid and heavy. The cheapest quality is the kitchen sink.

Equipped with a digital door, I guess that's the highest tech freebie included.

This post has been edited by tmc: Jul 22 2015, 12:35 PM
tmc
post Jul 22 2015, 05:35 PM

Regular
******
Senior Member
1,185 posts

Joined: Dec 2011
QUOTE(yeeck @ Jul 22 2015, 05:19 PM)
Just drove by Skypod today...seriously looks cheap from the outside....hehehe
*
The inside is definitely much better than outside. smile.gif

The glass walled gym, the swimming pool layout and design, the walk way, the lobby etc. High ceiling for most of the common facilities. I won't say is extremely high class but definitely not budget hotel style. wink.gif

This post has been edited by tmc: Jul 22 2015, 05:36 PM
tmc
post Aug 5 2015, 10:36 AM

Regular
******
Senior Member
1,185 posts

Joined: Dec 2011
Some pictures I have taken

This is the very heavy door ( likely antifire ? ) with digital lock

Attached Image

Bathroom facility shown is what you get from the developer

Attached Image

Attached Image

Tiled walkway to the respective unit

Attached Image

Gym facility

Attached Image

Swimming pool

Attached Image

Attached Image

The ceiling is closed to 11 feet high.

This post has been edited by tmc: Aug 5 2015, 10:48 AM