QUOTE(peri peri @ Jul 12 2012, 06:04 PM)
Hard to tell, MRT may change plan from time to time, last heard was connecting from plaza phoenix via the connecting road to bandar tun hussien onn then punched thru behind C180 and tag along Silk highway until saujana impian and last depot somewhere around sg balak kajang. Its depends on how smooth is the land acquisition and take over of existing property.
Seanooi kor is senior, later sub sale might sapu from me, who know.
Added on July 12, 2012, 5:05 pmi don have much budget for rm500 to 650 psft on a ummp address.
The MRT track Bandar Tun Hussein Onn - Balakong - Taman mesra/ Taman Koperasi already awarded to MTD
Balakong station , confirm la will be near batu 11 KFC ( about 80 to 120 meter from this kFC)
http://www.btimes.com.my/articles/20120627173636/Article/Bumiputera construction company, MTD Construction Sdn Bhd expects to start work on the mass rapid transit (MRT) V7 viaduct package, worth RM499.98 million, from Bandar Tun Hussein Onn to Taman
Mesra in Cheras on August 7.
Executive vice president head, construction and contracts division Ir Md Shukor Mohamed said the viaduct work stretched approximately 3.83 kilometres and will be the alignment for two MRT stations near Balakong and Taman Koperasi in Cheras.
"This package is part of the exclusive Bumiputera package that makes up 43 per cent of the total value of the MRT project," he said at a media briefing in Kuala Lumpur today.
Read more: MTD to start construction of MRT V7 on Aug 7
http://www.btimes.com.my/articles/20120627.../#ixzz20OivyE8xThis post has been edited by tikaram: Jul 12 2012, 05:10 PM