Dear Lowyat forumers and all the sifu ,
i actually got one quatation for plaster celling and wiring.
palin celling 2.50/ sf quantity 1054 sf = RM 2,635.00
L BOX 13/FR quantity54 : RM 702.00
main hole RM80.00 PER PCS QTY 1: RM80
down light rm45 pcs 33 PCS : RM 1485.00 (WITHOUT THE DOWN LIGHT)( WIRING ONLY)
T 5 rm 40 per pcs qty 12:RM 480
FAN RM 60 PER PCS QTY 5:RM 300
AIR COND POINT RM 180 PER PCS QTY 4 PCS; RM 720.00
SWITCH 65 PRE PCS QTY 4= RM 260.00
HIDROGEN LIGHT RM 45 PER PCS QTY 3 = RM 135.00
TOTAL ALL :RM 6,797.00.
GUYS my main concern is the down light, T5, SWITCH AND HIDROGEN LIGHT INSTALLATION THAT EXPENSIVE MEH ?
OR THIS IS THE MARKET PRICE...
PLS ALL I VERY NOOB ON THIS.
BY THE WAY I WILL MEET UP WITH THE CONTRACTOR TONIGHT TO DISCUSS ON THIS ..
THX IN ADVANCE........
plaster celling and wiring, pls help criously need help here
Apr 12 2012, 05:08 PM, updated 14y ago
Quote
0.0243sec
0.23
5 queries
GZIP Disabled