Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

 Rimba Residence @ Bandar Kinrara (BK5)

views
     
emyght2016
post May 8 2016, 01:46 PM

Getting Started
**
Junior Member
91 posts

Joined: May 2016
vp in progress..

LAD in process, including the accessory parcel.. shud be able to tahan 6 mths' installment..

juz to refresh from my scant memory, fittings and furnishing is quite complete.. everything except the loose furnishing and the fridge..

it is preinstalled with designer door grille, fully-airconded, 2-in-1 washing machine cum dryer, built-ins like shoe-cabinet, wardrobes, kitchen cabinet, cooker hood & hob, vanity sets, shower screens, instant water-heater, dressing table.. i believed it is very friendly for both own-stay and rental play with low-entry to move-in..

low density of 238 units on a 3.6 acres land.. a little bit of the "LRT" effect, from 400/sqf entry level.. congrats to early birdies esp those whom got the smallest 1,145 sqf..
emyght2016
post May 9 2016, 02:42 PM

Getting Started
**
Junior Member
91 posts

Joined: May 2016
QUOTE(ace77 @ May 8 2016, 02:51 PM)
Does not seem to get a quality product. Developer not follow the showroom design and finishing.
*
if i am the purchaser, i think i wud hv factored in the quality and finishing already based on the KR1 & KR2 inferior designs.. pricing discounted on relative basis for the informed purchasers.. no surprise from this developer, managed expectations.. just like the price between elements and m-city..

showroom design and finishing is quite deceptive, hence never rely aesthetics.. only recourse is prolly to check the specifications, which is usually spelled out in the SPA and architect plans (if u can get a copy).. hard evidence will save a lot of time barking up the tree.. m2c..
emyght2016
post May 9 2016, 02:57 PM

Getting Started
**
Junior Member
91 posts

Joined: May 2016
QUOTE(gks @ May 9 2016, 02:52 PM)
Any photos to be shared?
IMO... Doesn't matter what price is paid but the architectural and finishes should follow what promised in the show unit.
Cheap doesn't justify if developer cut corners.
*
mayland and empire also still got followers with the notoriety.. some will just go for profit..

i guess u must know what u are buying into.. i.e. the product vs the price.. and factor in the discounts and contingencies to buffer the gaps.. same goes to many projects apart from the very few elite ones..

no pics, just kpc.. how u are lately?


emyght2016
post May 9 2016, 03:21 PM

Getting Started
**
Junior Member
91 posts

Joined: May 2016
QUOTE(gks @ May 9 2016, 03:02 PM)
Long time didn't see you bro in forum. How's you been doing?

MEH ever has show unit?

Mayland has show unit and as far as I know.. The actual product finishes is quite reflective of what promised... Of coz... The workmanship is different story altogether...
*
haha.. out of job now, trolling and moonlighting a bi here and there..

yup,, actually there are 2 parts.. 1 is the specifications, hard facts which is more precised to manage.. the other part is the workmanship, this 1 quite subjective and to kick butts.. will also have to do a check on the contractor's track record for the diligent purchasers, not just the developer's background..

catch up..
emyght2016
post May 9 2016, 07:52 PM

Getting Started
**
Junior Member
91 posts

Joined: May 2016
QUOTE(gks @ May 9 2016, 05:28 PM)
other meaning is semi-retirement mode? good for you....  thumbup.gif Do contribute more in the forum...

*
gks boss, in contrary, calm before the storm..
emyght2016
post May 9 2016, 07:52 PM

Getting Started
**
Junior Member
91 posts

Joined: May 2016
QUOTE(gks @ May 9 2016, 05:28 PM)
other meaning is semi-retirement mode? good for you....  thumbup.gif Do contribute more in the forum...

*
gks boss, in contrary, calm before the storm..
emyght2016
post May 9 2016, 07:56 PM

Getting Started
**
Junior Member
91 posts

Joined: May 2016
QUOTE(SAHM @ May 9 2016, 05:22 PM)
Hi,  tsg, didn't expect to see you here. My regards. (You won't recognize me by this nick though.  icon_idea.gif )

*
walau, nostalgic.. best wishes to u too.. icon_rolleyes.gif
emyght2016
post May 10 2016, 09:42 PM

Getting Started
**
Junior Member
91 posts

Joined: May 2016
QUOTE(zyde @ May 10 2016, 04:46 PM)
how much the maintenance psf after complete?
*
indicatively 0.45/sqf.. initial maintenance rate is deceiving coz usually it is usually "artificially" subsidized on the under-utilised common properties and warranties by manufactures / vendors on the youthful facilities..

the real costs kicks often after the 12 mths when developer hands it over to JMB.. nvt, there is a guide / formula to calculate and depending on the quality of the services / product..

for RR in particular, maintenance resources may not be optimised due to the relatively lower density for purpose of sharing / distribution of the fixed costs.. however, the complementing factors like 7-layers of secuity, quadrant separation, 2-sty guardhouse may reduce manual labor / patrolling costs at the expense of higher system upkeep / support.. i suspect some additional costs on pest / "wild life" controls..

btw, heard that some VP'ed purchasers not too happy with the quality.. pre-subsale RM520/sqf for those who are seeking valuation.. of coz, developer's release units already benchmarked it even higher..

 

Change to:
| Lo-Fi Version
0.0328sec    0.64    7 queries    GZIP Disabled
Time is now: 14th December 2025 - 05:32 AM