Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed

Outline · [ Standard ] · Linear+

 Zeva suites @ Seri Kembangan, by Trinity Group

views
     
youngmasterho
post Apr 7 2015, 01:38 PM

Casual
***
Junior Member
335 posts

Joined: Jan 2003
QUOTE(AlvinChipmunk @ Apr 7 2015, 10:31 AM)
MEX highway exit in Seri Kembangan is 70% completed.
http://www.thesundaily.my/news/1371918
*
Properties in Seri Kembangan, especially with 3km radius from its interchange can easily appreciate by 10-20%. Imagine you need to get stuck in a jam for nearly 45mins before hitting to the Sg Besi Highway but reduce to only 5-10mins in future. drool.gif drool.gif

It comes with a price though, worth it coz you don't have to wake up early like before, spending more time in dreamland. wub.gif wub.gif

Hopefully the interchange will 'coincidentally' be completed when Zeva is CF ready! thumbup.gif thumbup.gif thumbup.gif
youngmasterho
post Apr 7 2015, 02:51 PM

Casual
***
Junior Member
335 posts

Joined: Jan 2003
QUOTE(csting87 @ Apr 7 2015, 02:37 PM)
Don't forget that next month mrt2 going to announce the station at Seri kembangan.
*
To my limited knowledge, if you refer to a sg buloh-putrajaya line, then it will not come to Equine Park area.

cry.gif

Instead, it goes through Mines-Serdang Jaya-UPM and ends in Putrajaya. I saw some heavy roadside constructions along Kajang Silk Ring Highway and believed is part of MRT2 tracks.
youngmasterho
post Apr 8 2015, 09:27 AM

Casual
***
Junior Member
335 posts

Joined: Jan 2003
QUOTE(miahak @ Apr 7 2015, 09:25 PM)
Construction that u mentioned are for widening the highway from 4 lanes to 6 lanes
*
thanks...i read from the news that the MRT2 alignment has yet to be finalized, still having 50-50 chance.

QUOTE(miahak @ Apr 7 2015, 11:36 PM)
With mrt, mex inerchange, kidex-skip (if materialized) shall improve connectivity, and reduce the infamous traffic congestion in this area.. But need to wait another 3-5 yrs to enjoyed the benefit..
*
at present, only MEX interchange has been constructing, the rest is still 50-50 chance. seems that my guts feeling that they will not widen the existing main road cutting across the entire SK. cry.gif

This post has been edited by youngmasterho: Apr 8 2015, 09:30 AM

Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0216sec    1.40    7 queries    GZIP Disabled
Time is now: 19th December 2025 - 10:11 PM