QUOTE(tomjason @ Apr 13 2012, 03:07 PM)
for tile:
For tile 1x1, the upah is RM2 sq ft. If include cement etc then RM4 sq ft.
For tile 2x2, the upah only RM2.5 sq ft, mean per tile upah only RM10. If include cement etc around RM18-RM20 per tile.
Hey Tom,For tile 1x1, the upah is RM2 sq ft. If include cement etc then RM4 sq ft.
For tile 2x2, the upah only RM2.5 sq ft, mean per tile upah only RM10. If include cement etc around RM18-RM20 per tile.
Thanks for taking time to provide so many good tips. Can you PM me the formula too?
Apr 15 2012, 11:58 AM

Quote
0.0141sec
0.34
7 queries
GZIP Disabled