QUOTE(tomjason @ Apr 3 2012, 08:21 AM)
PMed already.
This just to share tips during my KC installation. During the KC installation i hv made special briefing to the installer, where the water pipe line and wiring goes, so that they don drill that area. Also i kept my refrig box so that i can cover my new refridge and i also ask they to cover their faulty ladder with box so that they do damage my new tile. Actually, my tile and table top were cover with card box especially their tools.
[attachmentid=2770438]
Added on April 3, 2012, 4:43 pm...just to share as 'sampingan'......i want to reveal..never reveal before....the secret, why these indon worker is strong enough to do the wet work, in the sun and rainy..why they can tahan hard work every day....from my investigation, not all but many of them have injection for neuro bion, these neoro bion inject can give them extra strength...the neuro bion is for nerve vitamin....these worker had one a month or between 2 weeks..
Hi, can I have the formula as I am planning reno soon. Thank youThis just to share tips during my KC installation. During the KC installation i hv made special briefing to the installer, where the water pipe line and wiring goes, so that they don drill that area. Also i kept my refrig box so that i can cover my new refridge and i also ask they to cover their faulty ladder with box so that they do damage my new tile. Actually, my tile and table top were cover with card box especially their tools.
[attachmentid=2770438]
Added on April 3, 2012, 4:43 pm...just to share as 'sampingan'......i want to reveal..never reveal before....the secret, why these indon worker is strong enough to do the wet work, in the sun and rainy..why they can tahan hard work every day....from my investigation, not all but many of them have injection for neuro bion, these neoro bion inject can give them extra strength...the neuro bion is for nerve vitamin....these worker had one a month or between 2 weeks..
Dec 3 2020, 11:00 PM

Quote
0.0333sec
0.21
7 queries
GZIP Disabled