Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed
137 Pages « < 11 12 13 14 15 > » Bottom

Outline · [ Standard ] · Linear+

 Central Residence - Phase 2

views
     
ryder_78
post Sep 21 2012, 09:36 AM

Look at all my stars!!
*******
Senior Member
2,064 posts

Joined: Jul 2010


Thanks for the clarification. So that means the SOHO units of the replica model in the picture have been omitted and do not represent the actual building at site, presumably for clarity purposes to show the swimming pool in the middle.

So the showroom is not in Plaza See Hoy Chan but on the 11th floor of KWSP building. Has Yuk Tung set up a branch at KWSP building to set up the showroom? Interesting.
andythology
post Sep 21 2012, 10:06 AM

潛水員
*****
Senior Member
926 posts

Joined: Jan 2003
From: Kuala Lumpur


QUOTE(ryder_78 @ Sep 21 2012, 09:36 AM)
Thanks for the clarification. So that means the SOHO units of the replica model in the picture have been omitted and do not represent the actual building at site, presumably for clarity purposes to show the swimming pool in the middle.

So the showroom is not in Plaza See Hoy Chan but on the 11th floor of KWSP building. Has Yuk Tung set up a branch at KWSP building to set up the showroom? Interesting.
*
Model, is model. tongue.gif still represent the building itself according scale.
there are two model side by side at the showroom, need your own imagination to stitch both into one piece.

whats your concern about where's the showroom leh? cool2.gif
ryder_78
post Sep 21 2012, 10:12 AM

Look at all my stars!!
*******
Senior Member
2,064 posts

Joined: Jul 2010


No concern on the location of the showroom. Just wondering why it's not at Yuk Tung's HQ in Plaza See Hoy Chan but somewhere else instead. Presumably due to lack of space in setting up the showroom at See Hoy Chan.
andythology
post Sep 21 2012, 10:56 AM

潛水員
*****
Senior Member
926 posts

Joined: Jan 2003
From: Kuala Lumpur


QUOTE(ryder_78 @ Sep 21 2012, 10:12 AM)
No concern on the location of the showroom. Just wondering why it's not at Yuk Tung's HQ in Plaza See Hoy Chan but somewhere else instead. Presumably due to lack of space in setting up the showroom at See Hoy Chan.
*
just poking on you wink.gif Cheers. The showroom just next to SHC. 'consider' same place gua... Chill...

TSngaisteve1
post Sep 21 2012, 12:08 PM

Software Engineer
*******
Senior Member
6,779 posts

Joined: Dec 2005
From: Kuala Lumpur


QUOTE(andythology @ Sep 21 2012, 10:20 AM)
loan hasn't approve yet. who knows the bank rejects me. ;p
So far I see there are still plenty of the smaller units available. typical 1058sf and above are basically all booked, probably another few left only.
The showroom is at 11th Floor, KWSP building next to SHC.
The model in the photos is no differences that the video, it just that SOHO is not shown here as SOHO has another model just for itself. SOHO was the first launch, then it came The Courts, Centrina later. They 'categorized' The Courts & Centrina as serviced apartment, so is different compare to SOHO...
*
Anyone managed to snap SOHO photos can post it here also. Thanks.
jastan
post Sep 21 2012, 12:20 PM

On my way
****
Senior Member
510 posts

Joined: Jun 2012


QUOTE(ryder_78 @ Sep 21 2012, 10:12 AM)
No concern on the location of the showroom. Just wondering why it's not at Yuk Tung's HQ in Plaza See Hoy Chan but somewhere else instead. Presumably due to lack of space in setting up the showroom at See Hoy Chan.
*
The reason to setup up the showroom at KWSP building instead of at their office in Plaza See Hoy Chan is due to the Ceiling level is not high enough at Plaza See Hoy Chan. The developer wanted to built the show unit as per the actual unit in Central Residence to get the actual feeling of the unit. The ceiling required 10 ft 6' height. The high level of ceiling will create the spacious ambient that you feel different from others show units.
ryder_78
post Sep 21 2012, 12:26 PM

Look at all my stars!!
*******
Senior Member
2,064 posts

Joined: Jul 2010


QUOTE(jastan @ Sep 21 2012, 12:20 PM)
The reason to setup up the showroom at KWSP building instead of at their office in Plaza See Hoy Chan is due to the Ceiling level is not high enough at Plaza See Hoy Chan. The developer wanted to built the show unit as per the actual unit in Central Residence to get the actual feeling of the unit. The ceiling required 10 ft 6' height. The high level of ceiling will create the spacious ambient that you feel different from others show units.
*
Now i know the actual reason which is sensible. Thanks for the information.
andythology
post Sep 21 2012, 12:28 PM

潛水員
*****
Senior Member
926 posts

Joined: Jan 2003
From: Kuala Lumpur


QUOTE(jastan @ Sep 21 2012, 12:20 PM)
The reason to setup up the showroom at KWSP building instead of at their office in Plaza See Hoy Chan is due to the Ceiling level is not high enough at Plaza See Hoy Chan. The developer wanted to built the show unit as per the actual unit in Central Residence to get the actual feeling of the unit. The ceiling required 10 ft 6' height. The high level of ceiling will create the spacious ambient that you feel different from others show units.
*
Thanks for the enlightenment! rclxms.gif
TSngaisteve1
post Sep 21 2012, 05:41 PM

Software Engineer
*******
Senior Member
6,779 posts

Joined: Dec 2005
From: Kuala Lumpur


QUOTE(jastan @ Sep 21 2012, 01:20 PM)
The reason to setup up the showroom at KWSP building instead of at their office in Plaza See Hoy Chan is due to the Ceiling level is not high enough at Plaza See Hoy Chan. The developer wanted to built the show unit as per the actual unit in Central Residence to get the actual feeling of the unit. The ceiling required 10 ft 6' height. The high level of ceiling will create the spacious ambient that you feel different from others show units.
*
That's one of the the uniqueness of this Central Residence, having a higher ceiling. Good air ventilation. Good for renovation. Do not afraid hand hit the ceiling fan and etc. biggrin.gif rclxms.gif
andythology
post Sep 22 2012, 12:42 AM

潛水員
*****
Senior Member
926 posts

Joined: Jan 2003
From: Kuala Lumpur


anyone knows is it 1-phase or 3-phase wiring hah? I suppose the latter, but just asking. wink.gif
jastan
post Sep 22 2012, 08:02 AM

On my way
****
Senior Member
510 posts

Joined: Jun 2012


QUOTE(andythology @ Sep 22 2012, 12:42 AM)
anyone knows is it 1-phase or 3-phase wiring hah? I suppose the latter, but just asking. wink.gif
*
Referring to the brochure, they provide 13 amp power point which normally is single phase and they do provide 1 power point which is 15 amp.
andythology
post Sep 22 2012, 09:44 AM

潛水員
*****
Senior Member
926 posts

Joined: Jan 2003
From: Kuala Lumpur


QUOTE(jastan @ Sep 22 2012, 08:02 AM)
Referring to the brochure, they provide 13 amp power point which normally is single phase and they do provide 1 power point which is 15 amp.
*
Thanks for the info!
ryder_78
post Sep 22 2012, 10:20 AM

Look at all my stars!!
*******
Senior Member
2,064 posts

Joined: Jul 2010


Jastan, just wondering, do you have access to the architectural plans of the Central Residence service apartment, particularly the elevation view drawings?
jastan
post Sep 22 2012, 03:04 PM

On my way
****
Senior Member
510 posts

Joined: Jun 2012


QUOTE(ryder_78 @ Sep 22 2012, 10:20 AM)
Jastan, just wondering, do you have access to the architectural plans of the Central Residence service apartment, particularly the elevation view drawings?
*
sorry ryder, i dont have any architectural drawings.

andythology
post Sep 22 2012, 10:21 PM

潛水員
*****
Senior Member
926 posts

Joined: Jan 2003
From: Kuala Lumpur


QUOTE(ryder_78 @ Sep 22 2012, 10:20 AM)
Jastan, just wondering, do you have access to the architectural plans of the Central Residence service apartment, particularly the elevation view drawings?
*
I try ask the developer see if they able/willing to release that. Try ah, no promise.


Added on September 22, 2012, 10:26 pmOne of the SA told me that the piece of land that next to this (In front of Centrina, currently a sand stone factory) has been acquired by Yuk Tung too. Is gonna be a commercial development.

This post has been edited by andythology: Sep 23 2012, 07:18 AM
jastan
post Sep 23 2012, 03:48 PM

On my way
****
Senior Member
510 posts

Joined: Jun 2012


QUOTE(andythology @ Sep 22 2012, 10:21 PM)
I try ask the developer see if they able/willing to release that. Try ah, no promise.


Added on September 22, 2012, 10:26 pmOne of the SA told me that the piece of land that next to this (In front of Centrina, currently a sand stone factory) has been acquired by Yuk Tung too. Is gonna be a commercial development.
*
Dear Andy,

Hope what you said is true, and then it will be good news to all Central Residence buyers. Once Central Residence completed and well maintained, with common sense the developer will build the land and sell at a higher RM per sqft2 than the current selling price. The developer is confident on their development. This will indirectly boost Central Residence to another new level due to the mature development over there. rclxms.gif rclxms.gif

The stone factory that you mention is actually cement factory, I saw the cement truck coming in/out of the site. The operator should be Lafarge seeing their cement truck in/out.
I actually heard from a Sale Agent in the beginning year saying that YTL is eyeing the existing settler/ small factory operator beside the cement site stretch to the land near Nirvana building. I won’t be surprise if it is true coz we are just a small fry citizen and won’t know what the big timers are doing. Once the deal done, then only the public will know.

Similar like share price, the insider will start accumulate the shares. Once the good news is out and is time for them to dump to you. Once the good news out then it will be too late. cry.gif

So, now there is a logic why that area (including the Leaf condo opposite is selling at record high price) in the area of sungai besi because there are BIG thing happening that we don’t know. drool.gif

This post has been edited by jastan: Sep 23 2012, 03:49 PM
leagan
post Sep 23 2012, 05:12 PM

Getting Started
**
Junior Member
149 posts

Joined: Aug 2011
QUOTE(andythology @ Sep 22 2012, 10:21 PM)
I try ask the developer see if they able/willing to release that. Try ah, no promise.


Added on September 22, 2012, 10:26 pmOne of the SA told me that the piece of land that next to this (In front of Centrina, currently a sand stone factory) has been acquired by Yuk Tung too. Is gonna be a commercial development.
*
Good news rclxms.gif thanks.
At least, Central Residence is not alone there, hope the surrounding area can be transformed to look better.


Added on September 23, 2012, 5:46 pmIs anyone get their floor plan with bigger floor area covering the highlighted area?
user posted image

Because the facade is randomly box up for bout 2 fts, should have some unit with larger floor plan for same unit type?
user posted image

This post has been edited by leagan: Sep 23 2012, 05:46 PM
Seng_Kiat
post Sep 23 2012, 06:36 PM

Look at all my stars!!
*******
Senior Member
5,580 posts

Joined: Jan 2005
I am still waiing for the loan to be approved .. currently, I applied at maybank and affin bank ..

ambank and alliance approaced me but i yet to submit ... tomorrow maybe .. smile.gif ..
jastan
post Sep 26 2012, 01:03 PM

On my way
****
Senior Member
510 posts

Joined: Jun 2012


QUOTE(Seng_Kiat @ Sep 23 2012, 06:36 PM)
I am still waiing for the loan to be approved .. currently, I applied at maybank and affin bank ..

ambank and alliance approaced me but i yet to submit ... tomorrow maybe .. smile.gif ..
*
You can try Alliance bank. Faster coz Alliance bank is their Bank financing for this project. They know well about this project. If your document is complete and your Ccris is ok, then should be able to get ur loan approved in 2 to 3 weeks time
leagan
post Sep 26 2012, 01:14 PM

Getting Started
**
Junior Member
149 posts

Joined: Aug 2011
Newly lunch properties in Bukit Jalil seem hitting 800psf pricing now.. a good sign to Central Residence which is selling at 600psf

This post has been edited by leagan: Sep 26 2012, 01:34 PM

137 Pages « < 11 12 13 14 15 > » Top
Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0328sec    0.75    6 queries    GZIP Disabled
Time is now: 14th December 2025 - 07:24 AM