The once peaceful U-turn has is now home to 3 large slurry tanks. Now cannot go all the way down since the construction site has expanded in size


Geopancar (a piling contractor) bore-pile machine with a crawler crane next to it. All the streetlight, srubs and kerb has been removed for piling works. The place where the bore-pile machine is is where they will be a huge viaduct over the Kesas highway.

The opposite direction from the U-turn. They have started removing the kerb already.

Another U-turn to go to SS14 side. I think they are preparing the area for the piling machine. There are some diversion works on the way too.



Apr 27 2012, 10:02 PM