Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

> Ultimate LRT extension construction update thread!, Ara Damansara, USJ, Puchong!

views
     
mroys@lyn
post Mar 31 2012, 02:08 PM

Regular
******
Senior Member
1,037 posts

Joined: Jul 2009
Putra Height depot contract will be awarded soon.
mroys@lyn
post May 3 2012, 02:36 PM

Regular
******
Senior Member
1,037 posts

Joined: Jul 2009
anyone interested in lrt extension can participate in this visit:
http://www.myiem.org.my/events/eventregistration.aspx?id=611

mroys@lyn
post May 3 2013, 03:12 PM

Regular
******
Senior Member
1,037 posts

Joined: Jul 2009
QUOTE(stimix @ Apr 28 2013, 04:50 PM)
Nxt- The rail track reaching the flyover to Zest Kinrara -9:
user posted image
*
Why train on the 3rd level. i tot train is not good in climbing compare to car? why don't swap with 1st level?
mroys@lyn
post Nov 30 2013, 08:25 AM

Regular
******
Senior Member
1,037 posts

Joined: Jul 2009
QUOTE(jonc88 @ Nov 30 2013, 08:07 AM)
Welcome.. smile.gif

Here's a video by MRT Corp to show the description visually.. While it is by MRT Corp, the method is similar..

*
01:04
"...ensuring number of existing traffic lanes is maintained and minimizing disruption of traffic flow."

number of lane is maintained but the width is reduced to half. disruption of traffic flow? no comment.
contractor has been paid/priced for the traffic diversion in their works but sadly it doesn't reflected in the final outputs.
mroys@lyn
post Dec 1 2013, 09:10 AM

Regular
******
Senior Member
1,037 posts

Joined: Jul 2009
QUOTE(jonc88 @ Dec 1 2013, 12:32 AM)
As mentioned, the video is by MRT Corp for the MRT project.. LRT Extension Project is by a different company - Prasarana so they will not operate the same way nor have the same guarantees as MRT Corp..
*
I am referring to MRT project package V4.
mroys@lyn
post Mar 5 2014, 05:00 PM

Regular
******
Senior Member
1,037 posts

Joined: Jul 2009
QUOTE(stimix @ Mar 2 2014, 04:06 PM)
I don't think Binapuri-lah.. U can see the progress b4 IOI Mall which is under Binapuri Vs IOI Mall till Putra Height area by MRCB. and they have been blaiming the Tamil school for the past 1.5 yrs now when, Puchong folks knew that the overall progress are super slow while they keep blaiming the Tamil school.  doh.gif

Setia walk- I also suspect they are buiding a mini Flyover to reduce the jam near the junction there  hmm.gif
*
binapuri or mrcb not important... both are using acrew*rks as their launching sub-con.
mroys@lyn
post Aug 14 2014, 01:46 PM

Regular
******
Senior Member
1,037 posts

Joined: Jul 2009
QUOTE(callas @ Aug 13 2014, 11:35 PM)
Bina Puri progress fast,whereas TRC...sigh!
*
to be more accurate, BinaPuri vs MRCB for ampang line & TRC vs Sunway for Kelana line.
mroys@lyn
post Aug 15 2014, 08:07 AM

Regular
******
Senior Member
1,037 posts

Joined: Jul 2009
QUOTE(jonc88 @ Aug 15 2014, 07:15 AM)
He means Binapuri is fast even compared to TRC lah. Which is true cause TRC has been dragging their feet.
*
you mean mrcb & sunway is faster than bina puri? mrcb&sunway>bina puri>trc?

Bump Topic Add ReplyOptions New Topic
 

Change to:
| Lo-Fi Version
0.0302sec    0.29    7 queries    GZIP Disabled
Time is now: 7th December 2025 - 01:49 PM