Area Specific (Klang Valley: ___, ___, ___, ___, ___, etc.)
Home, Office, Factory, Institution, Conservation works, Organization.
Construct and Build
Overall Interior & Renovation Works:
( lump-sum lot stock & barrel )
_### CEMENT MASONRY WETWORKS & CERAMICS
泥水工 瓷砖 建筑装修工程 kerja-kerja basah
_### GLASS WINDOWS, ALUMINIUM & STAINLESS STEEL
玻璃 铝工 白钢 kaca aluminum keluli profil-logam
_### METALWORKS
铁工烧焊链接 五金合金白钢 kerja besi aloy
_### ROOFING
屋顶漏水油漆清理补洞换瓦 atap bumbung
_### PAINTING
油漆修补 mengecat bagai applikasi
_### OFFICE & Partitions
办公室写字楼 屏风 ofis pejabat bangunan kerja awam
_### CABINETS & FURNITURE SYSTEMS Carpentry Works
橱柜和家私系统 kabinet almari sistem perkakas perabot
_### WOODEN FLOORING
solid 木地板木地砖 kayu lantai
_### TABLE & KITCHEN TOPS
_### ELECTRICAL-ENGINEERING WORKS
_### WATERPROOFING
_### TERRAFORMED In-House branded Buildmat
Standalone/ Turn-Key:
( industrial specialization )
- EARTHWORKS
- ARCHITECTURE Works, Architect fees, consultation & advisory
- PIPING
- Structures & Builders (Klas A, C)
- Locksmithing (specialized)
- Datacenter (specialized) LAN center / Data server rooms
- CCTV Systems (specialized)
- Lightning Arrestor systems (specialized)

Portfolio link: http://www.flickr.com/photos/sy_organization/6604424931

Portfolio link: http://www.flickr.com/photos/sy_organization/6604425065/
- - - = = UNDER e-CONSTRUCTION = = - - -
- - - = = UNDER e-CONSTRUCTION = = - - -
- - - = = UNDER e-CONSTRUCTION = = - - -
- - - = = UNDER e-CONSTRUCTION = = - - -
- - - = = UNDER e-CONSTRUCTION = = - - -
Engagement:
# Re-opens after Chinese New Year (March 2012).
# Subject to manageability and scale, avaibiility of workers, scheduled planning (monthly booking), etc.
# Engagement, Requirements' Scoping & Sizing, Site Visit method on case by case basis. Simple procedures for Non-Referrals or without Word-of-Mouth site valuation works, T&C apply.
Contact officers:
Business Requirements / Relations Officer xxx xxx xxxx
Site Supervisors xxx xxx xxxx
Team Project Managers xxx xxx xxxx
- { after e-thread's topic construction opens } -
Also with affiliated groups, officially appointed contractors, and exco council. Industrial vertical leverage on costs of buildmats since 1974.
This post has been edited by World_of_Julie: Jan 30 2012, 01:28 PM
Dec 31 2011, 12:42 PM, updated 2d ago
Quote










0.0193sec
0.63
6 queries
GZIP Disabled