Always go deep into the details of the work scope eg hacking of wall of 9'x8' is RM250.00. Details should incl whether it incl disposing of the debris, smoothen the column and floor surface incl skimmed coat if needed etc
Finally.. a contractor.., What should I take note when hiring
Oct 10 2011, 09:24 PM
Quote
0.0118sec
0.21
6 queries
GZIP Disabled