Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed

Outline · [ Standard ] · Linear+

 The Leafz @ Sg Besi, Hot Selling now!

views
     
iv'N
post Mar 19 2012, 08:25 PM

On my way
****
Senior Member
657 posts

Joined: Jan 2003
its called a tandem parking.. (1 front, 1 back)

told before paying deposit
iv'N
post Mar 22 2012, 10:37 PM

On my way
****
Senior Member
657 posts

Joined: Jan 2003
QUOTE(OperaGhost @ Mar 22 2012, 10:30 PM)
As per yest the number is around 100.
*
thats not alot right? Total how many units again?


Added on March 22, 2012, 10:54 pmOh ya btw.. u guys aware the fittings, cabinets and washing machine all are gonna be installed after VP right?

They say give them 6 max months to do all those.. :|

This post has been edited by iv'N: Mar 22 2012, 11:04 PM
iv'N
post Mar 23 2012, 02:12 PM

On my way
****
Senior Member
657 posts

Joined: Jan 2003
I just signed SPA.

The cark park floor plan (for block c at least) is not spiral all the way up.. but its spiral like passing all the car park lots.. so basically will see all the cars if parking is all the way up.
iv'N
post Mar 24 2012, 02:12 AM

On my way
****
Senior Member
657 posts

Joined: Jan 2003
QUOTE(PrincipaliteY @ Mar 23 2012, 02:45 PM)
Ohh how is your parking lot? Got your nice feng shui spot? Which level are your parking at?
*
Parking lot is at level 4. Not sure about fengshui though lol.

Wished it was just infront of the lift but its not.. its further abit but dont think its too far since block c is not that 'long'


QUOTE(etseleste @ Mar 24 2012, 01:11 AM)
Darn, I would prefer to spiral all the way up and down, to save time, rather than going up or down a level from one end to the other end. Imagine after coming all the way down if ur car park located at highest level, u forgot to take something, and needlessly u need to drive all the way up.  doh.gif
*
I get what you mean, i live at kuchai avenue (near by the leafz) which have spiral all the way ramps.. but the leafz concept wise and the layout i saw.. the parking reminds me of apartments design that you can find in australia.
iv'N
post Mar 27 2012, 01:45 PM

On my way
****
Senior Member
657 posts

Joined: Jan 2003
QUOTE(SSblack @ Mar 24 2012, 02:29 PM)
This is not fair to us la, as long as they haven't finish up the internal, they shall not consider handing over to us lo. Logic thinking la, can we stay there without those fittings? Probably, will nego with them about this point.
*
the last time they told me is only after getting CF only can have their outsourced contractors to go in and install fittings and move the electrical items too


Added on March 27, 2012, 1:49 pm
QUOTE(etseleste @ Mar 24 2012, 06:01 PM)
Damn right u r. Once VP handed over, bank installment will start. But it is not completed yet so how to move in??
*
Well developer sales staff last time said - u can take the 6 months to rectify defects anyway @_@

anyway they said prolly take 3 months.. they say 6 months just to cover their ass. but of coz owners still get short end of the stick at end of the day

Also I've been told.. we only start paying installment (with principal) after developer has submit application for strata title and not vp?

This post has been edited by iv'N: Mar 27 2012, 01:56 PM
iv'N
post Apr 3 2012, 12:14 AM

On my way
****
Senior Member
657 posts

Joined: Jan 2003
QUOTE(PrincipaliteY @ Apr 2 2012, 03:56 PM)
So many things to sign.. but not a single copy of the documents can be taken. Is going back empty handed a norm?
*
You mean u didnt get the goodie bag too??

Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0350sec    1.20    7 queries    GZIP Disabled
Time is now: 18th December 2025 - 05:15 PM