Hi

I just installed

a) Auto Gate point using 7 core x 2.5mm PVC/SWA/PVC cable buried underground
b) Gate Light point using 2 core x 1.5mm PVC/SWA/PVC cable buried underground
c) Door bell point using 2 core x 1.5mm PVC/SWA/PVC cable burier underground

I read some people said 11 core armored cable for the gate but mine only have 7 core...So, is it sufficient? any disadvantage or problem that I may face in the future? I have been asked the contractor about this before install but he insisted 7 core was enough...

Anyone please give some explanation?

thanks a lot~


phoenix69
post Sep 7 2011, 11:13 AM

Regular
******
Senior Member
1,836 posts

Joined: Sep 2007


From what I know.. usually you get extra cores (1-2) for in the future when any of the cores deteriorate and you can replace (no need dig up the ground again).

Why not just get a 12 core, all kaw tim, got extra left over.
TStiensong
post Sep 7 2011, 11:16 AM

Look at all my stars!!
*******
Senior Member
2,237 posts

Joined: Jul 2011
It is not money issues....and I don't know why contractor don't want to install more core for me (more money to earn but they don't want)..

now, I am worried I may face problems in the future because of this....scared....haiz


Added on September 7, 2011, 11:17 ammay I know Autogate system usually required how many core?

This post has been edited by tiensong: Sep 7 2011, 11:17 AM
Jo_da48
post Sep 7 2011, 11:24 AM

Regular
******
Senior Member
1,529 posts

Joined: Feb 2011
From: PJ


If Look at you description, you are using 11 (7+2+2) core rights?

TStiensong
post Sep 7 2011, 11:29 AM

Look at all my stars!!
*******
Senior Member
2,237 posts

Joined: Jul 2011
QUOTE(Jo_da48 @ Sep 7 2011, 11:24 AM)
If Look at you description, you are using 11 (7+2+2) core rights?
*
Can be added up like that? I don't know...I thought gate itself should have 11 core?


phoenix69
post Sep 7 2011, 11:42 AM

Regular
******
Senior Member
1,836 posts

Joined: Sep 2007


If I remember right, for a normal set up 7 cores can kaw thim all the autogate + doorbell + lights. - no balance , all used up.
My contractor installing 9 cores (2 extra balance)

Maybe they want to sell you all the balance core they have in stock tongue.gif




weikee
post Sep 7 2011, 12:18 PM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
I don't know how 7 core can use for all gate, bell and light. Unless the light control are build on the autogate controller.

From my calculation you need 11 cores:-

Power = 3 Cores (L,N, & E)
Autogate Switch = 4 Cores (for 2 switch), some use 3 cores
Bell = 2 Cores
Light = 2 Cores

So you use up all 11, maybe 10

TStiensong
post Sep 7 2011, 12:22 PM

Look at all my stars!!
*******
Senior Member
2,237 posts

Joined: Jul 2011
ooh...according to the description of my quotation, bell, light and gate are separated...if all add up, mine one should be 11 core...


phoenix69
post Sep 7 2011, 12:44 PM

Regular
******
Senior Member
1,836 posts

Joined: Sep 2007


biggrin.gif Ahhh ... now its clear.. weikee you da man
TStiensong
post Sep 7 2011, 12:57 PM

Look at all my stars!!
*******
Senior Member
2,237 posts

Joined: Jul 2011
for me, renovation is a nightmare...If something doesn't done right, will end up a lot of problems..headache man...




phoenix69
post Sep 7 2011, 12:58 PM

Regular
******
Senior Member
1,836 posts

Joined: Sep 2007


Its fun at the same time biggrin.gif
You are building your own LEGO castle. rclxms.gif
weikee
post Sep 7 2011, 01:03 PM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
QUOTE(tiensong @ Sep 7 2011, 12:57 PM)
for me, renovation is a nightmare...If something doesn't done right, will end up a lot of problems..headache man...
*
Nothing is perfect at first time. So correction / corrective action will always happen.
Jo_da48
post Sep 7 2011, 02:19 PM

Regular
******
Senior Member
1,529 posts

Joined: Feb 2011
From: PJ


QUOTE(tiensong @ Sep 7 2011, 12:57 PM)
for me, renovation is a nightmare...If something doesn't done right, will end up a lot of problems..headache man...
*
talk about it...

orientaliew
post Sep 7 2011, 06:13 PM

Casual
***
Junior Member
331 posts

Joined: May 2009
QUOTE(tiensong @ Sep 7 2011, 12:57 PM)
for me, renovation is a nightmare...If something doesn't done right, will end up a lot of problems..headache man...
*
share with us so we can avoid the same mistake. biggrin.gif
skng03
post Sep 7 2011, 09:56 PM

Regular
******
Senior Member
1,450 posts

Joined: Oct 2008


QUOTE(weikee @ Sep 7 2011, 12:18 PM)
I don't know how 7 core can use for all gate, bell and light. Unless the light control are build on the autogate controller.

From my calculation you need 11 cores:-

Power = 3 Cores (L,N, & E)
Autogate Switch = 4 Cores (for 2 switch), some use 3 cores
Bell = 2 Cores
Light = 2 Cores

So you use up all 11, maybe 10
*
the minimum as below:

Power = 2 Cores (L,N)
the steel wire inside the 1st pvc skin = (E)

from WIKI: Armour: Steel wire armour provides mechanical protection, which means the cable can withstand higher stresses, be buried directly and used in external or underground projects.[4] The armouring is normally connected to earth and can also be used as the circuit protective conductor ("earth wire") for the equipment supplied by cable.

Autogate Switch = 3 Cores (for 2 switch)
Bell = 2 Cores
Light = 1 Cores (L only, N & E share with auto gate power)
total 8 cores


for 7 cores, the auto gate the lights on/ off control by the auto gate control panel.

7 cores = +- rm9.50/M
11 cores =+-rm15/M

go for 11 cores so that can have some spare, the cable wont cost much for link house 10m is more than enough whistling.gif


weikee
post Sep 7 2011, 10:42 PM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
QUOTE(skng03 @ Sep 7 2011, 09:56 PM)
the minimum as below:

Power = 2 Cores (L,N)
the steel wire inside the 1st pvc skin  =  (E)

from WIKI: Armour: Steel wire armour provides mechanical protection, which means the cable can withstand higher stresses, be buried directly and used in external or underground projects.[4] The armouring is normally connected to earth and can also be used as the circuit protective conductor ("earth wire") for the equipment supplied by cable.

Autogate Switch = 3 Cores (for 2 switch)
Bell = 2 Cores
Light = 1 Cores (L only, N & E share with auto gate power)
total 8 cores
for 7 cores, the auto gate the lights on/ off control by the auto gate control panel.

7 cores = +- rm9.50/M
11 cores =+-rm15/M

go for 11 cores so that can have some spare, the cable wont cost much for link house 10m is more than enough whistling.gif
*
The Steel protective usually is not grounded, unless the wireman do it. Also it usually cut out on the switch panel / faceplate.

This post has been edited by weikee: Sep 7 2011, 10:43 PM
feeroz
post Sep 8 2011, 10:18 AM

New Member
*
Junior Member
8 posts

Joined: Feb 2006
QUOTE(tiensong @ Sep 7 2011, 11:09 AM)
Hi

I just installed

a) Auto Gate point using 7 core x 2.5mm PVC/SWA/PVC cable buried underground
b) Gate Light point using 2 core x 1.5mm PVC/SWA/PVC cable buried underground
c) Door bell point using 2 core x 1.5mm PVC/SWA/PVC cable burier underground

I read some people said 11 core armored cable for the gate but mine only have 7 core...So, is it sufficient? any disadvantage or problem that I may face in the future? I have been asked the contractor about this before install but he insisted 7 core was enough...

Anyone please give some explanation?

thanks a lot~
*
Hi,

I'm about to do this too. Can I know how much roughly is the cost.

TQ
TStiensong
post Sep 8 2011, 10:29 AM

Look at all my stars!!
*******
Senior Member
2,237 posts

Joined: Jul 2011
a) Auto Gate point using 7 core x 2.5mm PVC/SWA/PVC cable buried underground RM450 (per nos)
b) Gate Light point using 2 core x 1.5mm PVC/SWA/PVC cable buried underground RM120 (per nos)
c) Door bell point using 2 core x 1.5mm PVC/SWA/PVC cable burier underground RM120 (per nos)
kamion
post Sep 8 2011, 12:55 PM

Casual
***
Junior Member
327 posts

Joined: Feb 2011
Question, so if the electrician run a single 7 core cable, and can do everything, then the electrician shouldn't charge separately for each type: autogate, bell and gate lights?


TStiensong
post Sep 8 2011, 02:14 PM

Look at all my stars!!
*******
Senior Member
2,237 posts

Joined: Jul 2011
Hmm..based on few quotations that I received, all charge separately....