QUOTE(upman @ Aug 7 2011, 06:59 PM)
I got quotation for masterbedroom toilet:
-hack off existing wall/floor tiles(RM1200),
-waterproof (RM750),
-relocate pipe for basin n shower head(RM500),
-new tiles n labor (RM2960).
All together RM5.4k
My toilet rough estimate is about 6.5 feet x 6.2 feet x 9 feet high. Quoted from a chinese contractor.
Is the price reasonable?
RM5400 does it include basin, shower, toilet bowl etc?-hack off existing wall/floor tiles(RM1200),
-waterproof (RM750),
-relocate pipe for basin n shower head(RM500),
-new tiles n labor (RM2960).
All together RM5.4k
My toilet rough estimate is about 6.5 feet x 6.2 feet x 9 feet high. Quoted from a chinese contractor.
Is the price reasonable?
Aug 11 2011, 12:04 PM

Quote
0.0151sec
0.58
6 queries
GZIP Disabled