 looking for contractor, to start in aug 2011

views
     
weikee
post Jul 26 2011, 03:57 PM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
Cheaper does not mean the best. Got lots of hidden cost involve.
Is good to get more, so you learn more.

weikee
post Jul 26 2011, 04:28 PM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
Kochin,

You got the approval permit already?

Your optional 4,5,6 will sure MPPJ come over and ask for permit. If no permit you may get stop work order, summon, or TEH BOH money.


weikee
post Jul 26 2011, 04:42 PM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
By 30th Nov or 1st Nov? 30 days make lots of difference.

Looking at your requirements, a full time committed contract should be able to do it.
weikee
post Jul 26 2011, 11:34 PM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
QUOTE(StevenL @ Jul 26 2011, 11:22 PM)
Errr.............chinese calendar next month refer to ghost festival i think, so do u still wanna start reno??
*
The contractor still need to eat.
weikee
post Jul 27 2011, 09:57 AM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
Only big firm will want to use that model, or renovation that go up few to few hundred thousand to Millions.

Maybe appoint WCT Engineering, Sun rise, Gamuda smile.gif

Don't forget to get Lawyer to sign, Malaysia Gov stamping and some other paper work too.
weikee
post Jul 27 2011, 01:24 PM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
QUOTE(kochin @ Jul 27 2011, 11:28 AM)
oh, did i left out the part where it's SO is GDP Architects, COW from Arup, TYLin, SKM, Meinhardt, DPA, RSP, Seksan, EDP, NDY, Primetech, Valdun, SSP, etc.
PM is yet to be decided. Either Bovis or Turner.
Contract will be redrafted by JUBM with peer review from KPK.

WCT, Gamuda, MMC, Shimizu, Daewoo, Leighton have already expressed their interest to participate.

shakehead.gif
no play play. i only receive 2 interested party only. job too small, nobody want to do. maybe i need to start buying cangkul and spade to do myself.
*
I am preparing my pmi certification. Please hire me.
weikee
post Jul 27 2011, 02:46 PM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
QUOTE(kochin @ Jul 27 2011, 02:36 PM)
on top of pmi, must come with the following for PM's criteria:
1. must have handled more than RM10b worth of GDV project in no more than 3 project
2. must have completed from start to finish one of the said project  tongue.gif
How about Perwaja Steel smile.gif
weikee
post Jul 29 2011, 11:13 PM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
QUOTE(@Adele @ Jul 29 2011, 11:08 PM)
Oh...aiyo, the indo guy tell me hacking and re-tiling is RM800. Then i asked him..'huh? then u dont do water proofing meh?' then he said yes. But he didn't advise whether he supply or not. So thanks for reminding me guys. I will ask him.

By the way, if he say RM800 only for labour cost. Is it still consider cheap? Can pakai or not..what u guys think?

I also need advise.. with indo guy, they dont do quotation using computer and stuff, how do i sign contract or ask them to separate labour cost etc? All based on 'speech' only so far now..
*
You got to take the risk, they don't sign anything, even they do how do you want to sue them? or bring them on court?

Quality wise, is a gamble, unless you know his work or been to his reference site.

Personally if the work is like RM 1.5k vs RM 800.00, i'll go for 1.5k, and worry less for more reputable contractor. Unless is difference are huge in $$$ term then maybe is worth the risk.
weikee
post Jul 29 2011, 11:25 PM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
QUOTE(@Adele @ Jul 29 2011, 11:17 PM)
weikee, he's recommended to me by a friend i know. I've seen his work, but only painting job, some re-wiring and doing table top. Seems fine to me...

The friend's sister's house re-wiring done by him, also ok. However i'm not sure about hacking and stuff, as they didn't ask him to do hacking...
*
Hacking and rewiring is not hard. Tiling really depend on skill.

My contractor quote me labor and cement only with the price of RM 4.8/sqft for floor, and RM 3.8/sqft for wall using Chinese sifu. Hacking is another amount. Not sure you get this price if only small work. But you can use this for a baseline.
weikee
post Jul 31 2011, 10:41 AM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
QUOTE(sl2007 @ Jul 31 2011, 10:18 AM)
Hi Adele,

The price per sqft for the works mentioned is reasonable.. Say take 10 days works at a ganger of 3.. Is RM1.5k oredy...
*
Yeah I think the price is ok, quality wise you got to hope it turn up good
weikee
post Aug 4 2011, 12:17 PM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
Hehe, maybe "no meat" to eat. And too rush of job.
weikee
post Aug 4 2011, 02:14 PM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
QUOTE(@Adele @ Aug 4 2011, 02:10 PM)
kochin, me too. Met a few they rougly give quote onli, but until now i didn't receive official quotation. Hmm.. takes so long to type out one meh?
Maybe like what was said... go back feel not enough 'meat' to eat.

Last time my unwanted stuff just ask one lorry move everything out RM80 SO FAST they carry the things out, throw for u or want to donate one they will send to donation place. Super efficient.
*
Not sure how you define official quote, my contractor list it in a A4 paper, and all the high level cost. Then we just confirm base on that. I also received some very detail too.

So each contractor work difference.
weikee
post Aug 4 2011, 03:09 PM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
QUOTE(@Adele @ Aug 4 2011, 03:06 PM)
Friends , can anyone advise whether they move their DB box before?

If move my DB box to somewhere else, means need to do re-wiring  right? Estimate 1K can do or not...?
*
How far away from current location? and how many mcb you have inside? if moving far. Lots of hacking and wire joining.
weikee
post Aug 4 2011, 08:04 PM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
QUOTE(@Adele @ Aug 4 2011, 03:11 PM)
from one wall to another wall. erm...about 7 feet away?

what is mcb? is it means those push up down switches? standard one..err perhaps like 10 or 12 gua. i need to change to bigger db box anyway. estimate how much to do that ya?
*
Me not contractor so cannot give you amount. But i think you need to add additional cable to extend to another area.
weikee
post Aug 12 2011, 10:35 AM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
QUOTE(kochin @ Aug 12 2011, 12:21 AM)
meaning where you want the position of the first tile to be laid.
this is for you to plan in order to:
1. minimise wastage
2. prevent small cut pieces (say 50-100mm at the end of your wall)
3. prevent joint line at unsightly area (say the joint line is crossing at somewhere obvious)

am also dictating where my floor trap should be. shocking.gif
*
Let the tiler do for you la. They do water proofing and floor tiles last. Wall first.

 